Similar Projects
Constructed Recharge Facility
New Construction
Conception
$1,750,000 est. value
Casa Grande, AZ

Y--GRCA 190083 - Improve Potable Water Supply to Innercanyon and South Rim, Transcanyon Water Distribution Pipeline, Grand Canyon National Park
Term Contract
Design
$80,000,000 to $120,000,000 est. value
Grand Canyon, AZ

Navajo Point Pump Station
Renovation
Bidding
$60,000 est. value
Bylas, AZ

District 6 St. John's Waste Water Treatment Facility Expansion and Lift Station Upgrade
Renovation
Bidding
$300,000 est. value
Phoenix, AZ

Recoat Discharge Tubes at Mark Wilmer Pumping Plant
Renovation
Post-Bid
Phoenix, AZ

Storm Water Pump Lift
Term Contract
Post-Bid
Phoenix, AZ 85012

Construction Manager at Risk Booster Pump Station 83A/B Rehabilitation
Results
$8,500,000 to $1,500,000 est. value
Scottsdale, AZ 85258

Booster Pump Station 10 Improvements
Results
$585,000 to $715,000 est. value
Scottsdale, AZ

Zone 6E Reservoir and Booster Pump Station (Design Build)
New Construction
Bidding
$16,000,000 est. value
Peoria, AZ

4540--644-Storm Water Lift Station Repair
Term Contract
Post-Bid
Phoenix, AZ 85012

Booster Pump Station Header Assembly Replacement
New Construction
Results
Maricopa, AZ

Major Lift Station Upgrades Construction Project
New Construction
Post-Bid
$2,000,000 to $5,000,000 est. value
Sedona, AZ

Somerton High School Sewer Lift Station
New Construction
Results
Somerton, AZ 85350

Avondale 10th Street Force Main Replacement CMAR
Infrastructure
Post-Bid
$1,250,000 est. value
Avondale, AZ 85323

Pump Station Improvements
New Construction, Infrastructure
Results
AZ

Last Updated 06/30/2022 02:19 PM
Project Title

LHC Chip Drive Lift Station Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Lake Havasu City, AZ 86406   (Mohave County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the replacement and addition of certain valves and header piping, and a full electrical system rehabilitation including three pump panels, main service upgrade, lighting, main switchgear, SCADA/RTU, standby diesel generator, associated conduits and wiring, new metal shade canopy, along with related civil/site upgrades as necessary. Temporary hauling of sewage and plugging inlet sewer will also be required to facilitate construction.

Details

Lift and Pump Stations, Renovation.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents