Similar Projects
Administration Building and Judicial Center Chiller Replacement
Results
Less than $240,140 est. value
Lexington, SC 29072

HVAC and Electrical Services
Term Contract
Post-Bid

Furnish and Deliver Annual Maintenance and Support for an APC/Schneider Cooling System, Pumps and In-Row Coolers
Post-Bid
Lexington, SC

HVAC Unit
Results
Less than $11,051 est. value
Irmo, SC 29063

Trane HVAC Units
Results
West Columbia, SC 29169

HVAC Replacement
Post-Bid
$400,000 to $500,000 est. value
West Columbia, SC 29170

HVAC Unit
Results
$12,978 est. value
Chapin, SC 29306

HVAC Unit
Results
$26,820 est. value
Irmo, SC 29063

HVAC Inspection and Preventative Maintenance Services
Post-Bid
West Columbia, SC 29170

New Carrier HVAC Units
Results
West Columbia, SC 29169

Columbia State Farmers Market Buildings HVAC Service and Repair
Term Contract
Post-Bid
West Columbia, SC 29172

MDC Dehumidification System Replacement
Results
$150,000 to $200,000 est. value
West Columbia, SC 29170

Replace HVAC Units and Some Duct Work at Police Department
Post-Bid
Irmo, SC

HVAC and Mechanical Products
Term Contract
Post-Bid

Riverside Water Treatment Plant HVAC Replacement
Post-Bid
West Columbia, SC

Reported 02/22/2020 12:00 AM
Project Title

Purchase and Installation of a 110 Ton Trane or Carrier Chiller

Physical Address View project details and contacts
City, State (County) Lexington, SC   (Lexington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. A new 110 ton chiller that qualifies for Energy Wise Business rebates through SCE and G 2. Documented removal and disposal of all replaced equipment according to all Federal and State guidelines. 3. All installation, equipment, rigging, crane(s), and materials required to integrate the new system into the current control system. 4. Complete start up and testing of the new unit 5. Installation will be completed according to the requirements of the current edition of the International Mechanical Code and Energy Conservation Code

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents