Similar Projects
Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Lincoln Avenue South of Wascher Drive To South of Killarney - City of Urbana
Infrastructure
Conception
$1,930,550 CJ est. value
Urbana, IL 61801

Champaign County Detention Center Expansion
Addition, Demolition, Infrastructure
Design
$3,000,000 CJ est. value
Urbana, IL 61802

Replacement of Large Diameter Culvert With Upstream Permanent Erosion Control
Infrastructure
Bidding
$123,215 CJ est. value
Mahomet, IL 61853

High School Parking Lot
Infrastructure
Bidding
$400,000 CJ est. value
Saint Joseph, IL 61873

Congress Avenue & Sheldon Street Resurfacing
Infrastructure
Post-Bid
Rantoul, IL 61866

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Seal Coat
Infrastructure
Results
Less than $50,116 est. value
Fisher, IL

Resurfacing Congress Avenue
Infrastructure
Results
$1,205,311 est. value
Rantoul, IL 61866

Indian Grocery Store
Renovation, Alteration - 5,100 SF
Construction
Champaign, IL 61820

Hotel Royer Tapestry Collection by Hilton
Renovation, Infrastructure
Construction
$8,693,115 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Windsor Road Resurfacing
Infrastructure
Pending Verification
$300,000 CJ est. value
Urbana, IL 61801

Pennslyvania Avenue West Of Orchard Street Resurfacing To Race - City of Urbana
Infrastructure
Conception
$617,150 CJ est. value
Urbana, IL 61801

General Concrete Bid 2023
Infrastructure
Bidding
$100,000 CJ est. value
Champaign, IL 61820

Last Updated 02/14/2023 09:43 AM
Project Title

Sidewalk Improvements 2023 Phase 1

Physical Address View project details and contacts
City, State (County) Urbana, IL 61801   (Champaign County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $190,579 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of Sidewalk Improvements 2023 - Phase 1 (Section 22-00651-00-SW) - which includes replacement of existing segments of concrete or brick sidewalks and replacement of existing curb ramps at various locations The plans and proposals are each a call for bids containing all requirements governing the letting and performance of the particular contract including but not limited to any applicable requirements for the payment of prevailing rates of wages for labor as required by law. Any questions regarding individual plans and proposals should be directed to the City of Urbana Public Works Department. Each proposal shall be accompanied by a bid bond according to BLRS Special Provision for Bidding Requirements and Conditions for Contract Proposals. All bidders are hereby notified that the City of Urbana is required to affirmatively insure that the contract, entered into pursuant to this advertisement, will be awarded to the lowest responsible bidder and on a non-discriminatory basis. The lowest responsible bidder must have an active Equal Employment Opportunity (EEO) Certificate of Compliance from the City of Urbana before the contract can be awarded. Applications for EEO Certificate of Compliance are reviewed only once per month by the City of Urbana; therefore, all bidders are encouraged to apply for EEO certification in advance of the bid opening. All bidders are hereby notified that any proposal requiring work to be performed by a contractor requires the prime and subcontractors to participate in an approved training program. All bidders must complete BLR 12325 and return with the bidders' proposals. If BLR 12325 is not completed, the bid will not be read. Various sidewalk maintenance, reconstruction, and new construction to address the needs identified in Urbanas Pedestrian Master Plan and identified through public involvement, including condition, compliance, and connectivity gaps.Ph 1-Fall 2022: basic repair/replacement projects not requiring detailed survey and design.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents