Similar Projects
Whitewater Lift Station Rehabilitation Project
Renovation
Bidding
CO

Bell Roth Pump Station Electric Service Upgrade
Renovation
Bidding
CO

Murphy Creek Lift Station Wetwell Recoating
Post-Bid
Aurora, CO

South St. Vrain Creek Pipeline Pump Station Construction
Renovation
Post-Bid
Longmont, Lyons, CO 80540

Notice of Request for Contractor Qualifications
Term Contract
Results
Thornton, CO 80229

Lift Station Valve Assembly Construction
Results
Less than $122,000 est. value
Falcon, CO

Sunset Mesa Water Tank and Pump Station Project
Results
Less than $4,000,000 est. value
Montrose, CO

Eccv Office Expansion
Renovation
Results
Less than $2,000,000 est. value
Aurora, CO 80016

WWTF Headworks and Lift Station Rehabilitation
Results
Less than $408,900 est. value
Lamar, CO 81052

On-Call Lift and Booster Pump Station Maintenance
Term Contract
Results
Brighton, CO 80601

Northern Water Supply Project North Booster Pump Station (NBPS) Overflow Channel Project
Results
Aurora, CO 80016

Mead Middle School Vertical Turbine Pump Station
Results
Mead, CO 80542

Clarkson Pump Station
Results
Denver, CO 80204

Nine-Mile Driver Relief Station Replacement
Results
Denver, CO

South Street Vrain Creek Pipeline Packaged Pump Station Equipment Package
Results
Longmont, CO

Last Updated 01/31/2022 11:35 PM
Project Title

High Head Pump Station/Low Head Pump Station MCC Replacement Project

Physical Address View project details and contacts
City, State (County) Canon City, CO   (Fremont County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of existing Motor Control Centers with Variable Frequency Drives for its raw water pumping stations that provide the raw water supply to the CaƱon City Treatment Plant. The work requires the removal of existing motor control starter cabinets, installation of new switchboards, power zone centers, variable frequency drives, active harmonic filters, and wire and cable.

Details

Lift and Pump Stations, Renovation.
Division 11 - Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Switchboards and Panelboards, Switchboards, Motor-Control Centers, Low-Voltage Controllers, Variable-Frequency Motor Controllers.
Division 33 - Utilities, Wastewater Utility Pumping Stations.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents