Similar Projects
Sawmill Mixed Use Future Phases
New Construction, Infrastructure
Conception
$200,000,000 CJ est. value
Summerville, SC 29483

Intersection Improvement S-169 (Von Ohsen Rd)/S-881 (Lincolnville Rd)
Infrastructure
Conception
$2,100,000 CJ est. value
Summerville, SC 29485

Downtown Nexton Mixed-Use
New Construction, Infrastructure - 310,000 SF
Design
$100,000,000 CJ est. value
Summerville, SC 29483

Roper St. Francis Outpatient Facility at Sawmill
New Construction, Infrastructure - 40,000 SF
Design
$50,000,000 CJ est. value
Summerville, SC 29483

Intersection Improvements - US 176(Berkeley County)
Infrastructure
Bidding
$2,100,000 CJ est. value
Summerville, SC 29483

RFP D/B - Bridge Replacement Program, A Design-Build Project
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Saint George, SC 29477

Harris Teeter Fuel Center #355 / Summerville
Demolition, New Construction, Infrastructure, Renovation
Post-Bid
$800,000 CJ est. value
Summerville, SC 29485

Proposed Mitigation Plans for SC-91 (Berlin Myers Parkway) Phase 3
Infrastructure
Post-Bid
$200,000 CJ est. value
Summerville, SC 29483

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

North Maple Extension Project - Re-Bid
Infrastructure
Results
$21,089,225 CJ est. value
Summerville, SC 29483

The Ponds - Phase 6
New Construction, Infrastructure
Construction
$66,000,000 CJ est. value
Summerville, SC 29483

Coastal Crossroad Logistics Center Phase 1 and 2
New Construction, Infrastructure - 2,500,000 SF
Pending Verification
$200,000,000 CJ est. value
Summerville, SC 29483

BID Group Wood Processing Expansion
Addition, Demolition, Infrastructure
Pending Verification
$10,600,000 CJ est. value
Saint George, SC 29477

FlexCold Patriot Boulevard Cold Storage Warehousing / North Charleston
New Construction, Infrastructure
Conception
$49,900,000 CJ est. value
Summerville, SC 29485

Redwood Materials - Camp Hall
New Construction, Infrastructure
Design
$3,500,000,000 CJ est. value
Ridgeville, SC 29472

Last Updated 04/03/2023 01:06 PM
Project Title

Rangewater North Maple Street

Physical Address View project details and contacts
City, State (County) Summerville, SC 29483   (Dorchester County)
Category(s) Entertainment/Recreation, Heavy and Highway, Residential
Sub-Category(s) Clubhouse/Social Club, Multi-Family Homes, Site Development, Swimming Pool(s)
Contracting Method Bids by Invitation
Project Status Construction start expected July 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $65,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

31 buildings, a pool and amenity building As of April 3, 2023, Final Design was approved December 2022. No building permits have been submitted to the city. Information regarding contractor has yet to be determined. Although a firm timeline has yet to be announced, construction is estimated to begin in mid 2023.

Details

3 Stories Above Grade, Parking Spaces, 481 Parking Spaces.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents