Project Title | Sylvania Park Bandshell Roof Replacement |
Physical Address | View project details and contacts |
City, State (County) | Fairmont, MN 56031 (Martin County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected September 2023 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Copy Center - 07/21/23 |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | A. Project Name: Sylvania Bandshell Roof Replacement B. Owners Name: City of Fairmont C. Architect's Name: Wold Architects and Engineers. D. Additional Project contact information is specified in Section 00 01 03 - Project Directory. E. The Project consists of the construction of re-roofing. 1. Briefly and without force and effect upon the Contract Documents, the Work of this single prime Contract can be summarized as follows 2. Work under this Contract includes: a. Sitework: 1) Site restoration of areas disturbed by construction, staging, equipment, etc. b. Building Enclosure: 1) Roofing systems of fully adhered single ply and pre-finished metal coping. F. Keep Architect fully informed about progress of the work, performance of the work and potential problems. This project includes: Replacement of existing roof system. Make proposals on the bid forms supplied in the Project Manual. No oral, telegraphic or telephonic proposals or modifications will be considered. Submit with each bid, a certified check or acceptable bidder's bond payable to City of Fairmont in an amount equal to five percent (5%) of the total bid. The successful bidder will be required to furnish satisfactory Labor and Material Payment Bond, and Performance Bond. Bids may not be withdrawn within thirty (30) days after the scheduled time of opening bids, without the consent of the Owner. The Owner reserves the right to accept any bid or reject any or all bids, or parts of such bids, and waive informalities or irregularities in bidding. The Owner requires Substantial Completion of the project on or before November 3, 2023. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |