Similar Projects
Glenwood St, Goddard Rd / US 20/26 (Chinden Blvd) - Ada County Highway District
Infrastructure
Conception
$762,000 est. value
Boise, ID

SH-55, Eagle Road; I-84 to SH-44
Infrastructure
Bidding
$15,000,000 to $25,000,000 est. value
Eagle, ID 83616

Driving Track Phase 2 - Meridian Complex, Idaho State Police
Infrastructure
Bidding
$670,900 est. value
Meridian, ID 83642

Fort Street to Hill Road Traffic Calming
Infrastructure
Post-Bid
$715,316 est. value
Boise, ID 83716

Asphalt Road Planer
Infrastructure
Post-Bid
Boise, ID

SH-64, NezPerce to Drake Road
Infrastructure
Results
$100,000 to $500,000 est. value

Widening SH-21 Between MP 0.787 and 3.023
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Capital Maintenance Phase Two
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
ID

Moscow North and Moscow Alt Route
Infrastructure
Results

Capital Maintenance, Phase 3, ACHD, Boise Area
Infrastructure
Results
$500,000 to $1,000,000 est. value
ID

Julia Davis Park Roadway and Greenbelt Renovations
Infrastructure
Results
$800,000 est. value
Boise, ID 83702

Int SH-16 to Linder Rd
Infrastructure
Results
$5,000,000 to $10,000,000 est. value
Boise, ID

SH-16, I-84 to Franklin Rd
Infrastructure
Results
$25,000,000 est. value
Eagle, ID 83616

Landfill North Ravine Cell Topsoil Stripping
Infrastructure
Results
$200,000 est. value
Garden City, ID 83714

North 25th Street Extension
Infrastructure
Results
$30,000 est. value
Boise, ID 83702

Last Updated 07/12/2022 02:22 PM
Project Title

Maple Grove Road and Edna Street Pedestrian Crossing - Ada County Highway District

Physical Address View project details and contacts
City, State (County) Boise, ID 83704   (Ada County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Traffic Signalization
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2027
Bids Due View project details and contacts
Estimated Value $245,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Install an enhanced pedestrian crossing (pedestrian hybrid beacon) on Maple Grove Rd at Edna St in accordance with the West Bench Neighborhood Plan. (CM213--49) The project is included in the highway district's 2022-2026 Capital Improvement Program (CIP). As of July 11, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals, Traffic Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents