Similar Projects
Badger Pump Station - Kingbrook Rural Water System
New Construction, Infrastructure
Bidding
$1,800,000 CJ est. value
Arlington, SD 57212

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Lake Preston Water and Wastewater Improvements Phase 1 and SDDOT Park Avenue Street Improvements
Infrastructure
Results
$6,500,000 to $7,000,000 est. value
Lake Preston, SD 57249

Net-Zero 1 Biofuel Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$980,000,000 CJ est. value
Lake Preston, SD 57249

Net-Zero 1 Biofuel Manufacturing Facility
New Construction, Infrastructure
Pending Verification
$980,000,000 CJ est. value
Lake Preston, SD 57249

Underground Infrastructure Inspection
Infrastructure
Post-Bid

Bridge Deck Sweeping in the Huron Area
Infrastructure
Results
Huron, SD

Airport Pavement Maintenance Project
Infrastructure
Post-Bid

Rout and Seal
Infrastructure
Results
$139,000 est. value
De Smet, SD 57231

Seal Coating
Infrastructure
Post-Bid
Arlington, SD

Asphalt Concrete Resurfacing
Infrastructure
Results
$5,000,000 est. value

413th Ave Structure Replacement - Sanborn County
Infrastructure
Post-Bid
$300,000 est. value
Iroquois, SD 57353

Highway 25 Relocation Project
Infrastructure
Results
$2,597,570 CJ est. value
De Smet, SD 57231

Last Updated 04/06/2023 11:14 AM
Project Title

Arlington East Birch Street and West Hickory Street Improvements

Physical Address View project details and contacts
City, State (County) Arlington, SD 57212   (Kingsbury County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,024,508 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

**As of April 06, 2023, project was awarded, start date is Mid June and end date will be on 10/30** Furnish and install approximately 275 of storm sewer pipe, an area inlet, 2 drop inlets and a storm manhole. Furnish and install approximately 3,000 LF of 6" drain tile. Approximately 4 blocks of street reconstruction and new surfacing consisting of approximately 3,365 Ton of gravel base course and approximately 1,380 Ton of Hot Mix Asphalt Pavement and approximately 6,240 SY of Geotextile Fabric, and approximately 330 SY Geosynthetic Geogrid. Pour approximately 3,000 LF of concrete curb and gutter along with concrete driveway approaches. East Birch Street Utility Improvements Bid Schedule No. 2 Furnish and Install approximately 930 LF of 8" Gravity Sewer pipe, and 4 manholes. Furnish and Install approximately 1410 LF of 6" Watermain pipe, 2 Fire Hydrants and associated materials for service connections. Probable Cost 1$850,000 to $1,100,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents