Similar Projects
Murphy Express #8592
New Construction - 2,800 SF
Conception
Columbia, SC 29201

Patterson Road Sidewalk
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29209

Shady Lane Force Main Replacement (SS7548) CDBE - Part 1
Infrastructure
Design
$661,770 CJ est. value
Columbia, SC 29206

US 76 over US 601
Demolition, New Construction, Infrastructure
Design
$9,648,000 CJ est. value
Columbia, SC 29205

Murphy Express #8592 - Bluff & Rosewood / Columbia
Demolition, New Construction, Infrastructure - 2,433 SF
Bidding
$2,000,000 CJ est. value
Columbia, SC 29201

Murphy Express #8592 - Bluff & Rosewood / Columbia
Demolition, New Construction, Infrastructure - 2,433 SF
Bidding
$2,000,000 CJ est. value
Columbia, SC 29201

Jackson Creek Site Restoration Project
Infrastructure
Post-Bid
Columbia, SC 29206

City of Columbia Olympia Fire Station Replacement
Demolition, New Construction, Infrastructure
Post-Bid
$7,000,000 CJ est. value
Columbia, SC 29201

Bitternut Pump Station Improvements (WM4574) CDBE - Phase II
Renovation, Infrastructure
Results
$833,948 CJ est. value
Columbia, SC 29209

Navy Base Intermodal Facility Advanced Work Package project
Demolition, Infrastructure
Results

Murphy Express #8935
New Construction - 2,800 SF
Construction
Columbia, SC 29204

7-Eleven #42012
New Construction - 4,650 SF
Construction
Blythewood, SC 29016

University of South Carolina Health Sciences Campus
New Construction, Infrastructure
Pending Verification
$300,000,000 CJ est. value
Columbia, SC 29209

Finlay Park Development
Infrastructure
Pending Verification
$10,000,000 CJ est. value
Columbia, SC 29201

RFP - Stream Restoration at Forty Acre Hp
Infrastructure
Conception
$250,000 CJ est. value
Columbia, SC 29201

Last Updated 01/19/2023 02:02 PM
Project Title

Valvoline Oil Change - Two Notch Road / Columbia

Physical Address View project details and contacts
City, State (County) Columbia, SC 29223   (Richland County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Gas Station, Site Development, Vehicle Sales/Service
Contracting Method Bids by Invitation
Project Status All Bids Received, Results Expected, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,200,000 [brand] Estimate
Plans Available from Negotiating General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

New ground-up construction of lube shop for Valvoline, Project includes site work to accommodate a three-bay garage. The building will be one story with a below-grade pit. Project to include mechanical, plumbing, electrical, structural and civil components. *The owner requests that all subcontractor / supplier inquiries be directed to the Negotiated GC.

Details

1 Story, 1 Story Below Grade, 2,817 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Metal Doors and Frames, Panel Doors.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage.
Division 11 - Equipment, Vehicle Service Equipment, Vehicle-Washing Equipment.
Division 22 - Plumbing, Facility Water Distribution, Facility Storm Drainage.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 31 - Earthwork, Site Clearing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Screening Devices, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents