Similar Projects
Deming Street Subdivision
New Construction
Conception
Newington, CT 06111

Quarry Meadows
New Construction
Conception
Trumbull, CT 06611

Chestnut Ridge
New Construction
Design
South Windsor, CT

Shuttle Meadow Country Club Condos
New Construction
Design
Berlin, CT

RFP - Housing Choice Voucher (Section 8) Project-Based Assistance Program
Term Contract
Bidding
$500,000 CJ est. value
New Canaan, CT 06840

RFP - 614 Albany Avenue Redevelopment Project
New Construction, Infrastructure
Bidding
$500,000 CJ est. value
Hartford, CT 06112

Housing Rehabilitation Contractors 2021
Post-Bid
Torrington, CT 06790

CDBG Housing Rehabilitation Project - 63 Elise Road
Renovation
Post-Bid
Mansfield, CT 06268

Development of 67-71 Minerva Street and 147 Caroline Street
Results
Derby, CT 06418

Single Family Housing Rehabilitation - 27 Salmon Brook Street
Results
Granby, CT 06035

Reservoir Estates
New Construction - 54,000 SF
Construction
Wethersfield, CT 06109

Gagarin Place
New Construction - 17,720 SF
Construction
$3,800,000 est. value
Litchfield, CT 06759

Connecticut Avenue Subdivision
New Construction
Pending Verification
Newington, CT

Military Road Residential
New Construction
Pending Verification
Middletown, CT 06457

Main Street Development
New Construction
Conception
Manchester, CT 06040

Last Updated 09/13/2022 03:31 AM
Project Title

City of Norwich Property Rehabilitation and Lead Paint Hazard Control Project

Physical Address View project details and contacts
City, State (County) Norwich, CT 06360   (New London County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Install a single hardwired Smoke/CO detector to the service panel in the basement if not present. Ensure for the proper functioning of existing, or installation of new ceiling Mounted battery operated Smoke/CO detectors outside all bedrooms. Not required in kitchens or bathrooms. Install standard battery operated smoke detectors in all bedrooms. Install or insure proper functioning of GFCI outlets near water sources in Kitchens/ bathrooms, and basement outlets or exterior outlets as may be required. Any exterior outlets must be GFCI and secured in an approved weather proof casing with a bubble cover. Secure any loose or hanging wires in the basement or throughout the dwelling as may be observed, and install proper boxes/box covers for any spliced or open wiring in the basement. The information contained in this bid package is for the purpose of providing general project specifications of the items included in the scope of work. Code compliance work required by the local building officials and fire marshal will be limited to those items directly relating to lead abatement activities. All other code compliance issues will be the responsibility of the property owner, and will not be funded under this program.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents