Similar Projects
District 6: Scheduled and Emergency Cleaning of Drainage Structures and Pipes at Various Locations
Infrastructure
Bidding
$453,525 est. value

Parker Lane Seawall Repair
Results
Less than $20,000 est. value
Marblehead, MA

Peabody Lane Seawall Repairs
Results
Less than $20,000 est. value
Marblehead, MA

Scheduled A Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $964,171 est. value

Drilling IDIQ in Massachusetts and Rhode Island
Results

Barker Street Culvert Replacement
Results
Less than $280,000 est. value
North Andover, MA

Chinking & Pointing Fort Beach Seawall
Results
Less than $50,000 est. value
Marblehead, MA 01945

Scheduled and Emergency Drainage Repairs and Improvements at Various Locations
Results
Less than $2,022,520 est. value

Ballard Street Culvert Restoration
Results
Less than $350,000 est. value
Saugus, MA 01906

Sea Wall Repairs Project
Term Contract
Results
Less than $600,000 est. value
Swampscott, MA 01907

Wharf, Bradley Wharf, Pigeon Cove Wharf Paving Repairs and Mitigation Project
Results
Less than $150,000 est. value
Rockport, MA 01966

Ductile Iron Pipe
Term Contract
Results
Beverly, MA

Pavement Resurfacing
Results
Less than $270,000 est. value
Amesbury, MA 01913

Valley Road Culvert Installation Project
Results
Less than $40,000 est. value
Boxford, MA 01921

Sedimentation Basin Collector Chain and Sprocket Replacement
Results
Methuen, MA

Last Updated 12/15/2021 09:13 AM
Project Title

2021 Drainage Improvements Greenwood Road and High Plain Road

Physical Address View project details and contacts
City, State (County) Andover, MA 01810   (Essex County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $175,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be done under this contract shall consist of furnishing and installing approximately 775 feet of HDPE drainage pipe, 12 to 24 inches in diameter, complete with manholes, catch basins, water quality control structures, and other related work, to replace the existing drainage infrastructure on Greenwood Road and High Plain Road.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents