Similar Projects
Elevator Maintenance
Post-Bid
Tomah, WI 54660

Escalator Service
Post-Bid
Madison, WI 53703

Elevator Replacement
Results
$431,100 est. value
Stevens Point, WI 54481

Elevator Repairs
Results
Less than $230,000 est. value
Madison, WI

Elevator Modernization
Renovation
Post-Bid
Racine, WI 53403

U009--Sources sought - SwissLog Pneumatic Tube System Onsite Training at the MIlwaukee VAMC
Results
Milwaukee, WI 53295

Milwaukee Prisoner Elevator Modernization
Post-Bid
$500,000 to $1,000,000 est. value
Milwaukee, WI 53202

Multi-Building Elevator Single Bottom Jack Replacement
Results
$2,925,000 est. value
Madison, WI 53706

Central Maintenance Facility Lift Replacement
Post-Bid
Eau Claire, WI 54703

City Hall 2021 Elevator Modification and Upgrade
Results
$480,000 est. value
La Crosse, WI

Elevator Maintenance and Repair Services
Term Contract
Post-Bid
WI

Elevator and Escalator Maintenance and Repair Services (Group 2)
Term Contract
Post-Bid
WI

Elevator and Escalator Maintenance and Repair Services (Group 1)
Term Contract
Post-Bid
WI

Doyle - 2021 Elevator Replacement
Alteration
Post-Bid
Madison, WI 53703

Elevator Maintenance
Alteration
Post-Bid
Madison, WI 53703

Last Updated 07/23/2021 08:42 AM
Project Title

B402 Elevator Replacement Tomah VA Medical Center

Physical Address View project details and contacts
City, State (County) Tomah, WI 54660   (Monroe County)
Category(s) Single Trades
Sub-Category(s) Conveying Systems
Contracting Method Competitive Bids.
Project Status Pre-Solicitation
Bids Due View project details and contacts
Estimated Value $2,000,000 to $5,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project: 676-14-110B Replace Elevator in B402 Location: Tomah VA Medical Center 500 E. Veterans Street Tomah WI 54660-3105 This construction project involves the demolition of the existing elevator car, hoisting system, shaft, and the mechanical room along with the adjacent stairs that go from the first floor to the second. The existing shaft and stairwell will be infilled and become office spaces and storage rooms for first, second, and third floors. Two new elevators will be installed next to the existing elevator and mechanical rooms. The new shafts will be built in what are currently conference rooms and office spaces. Period of Performance is 400 calendar days after Notice to Proceed (NTP).

Details

Division 14 - Conveying Equipment, Elevators.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents