Similar Projects
6th Avenue and 28th Street Pulverizing & Relay, Limestone Base Replacement
Post-Bid
$64,000 est. value
Camp Douglas, WI 54618

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Street Resurfacing - Walnut Road And Lakeshore Way
Results
Twin Lakes, WI 53181

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Concrete Alley Pavement
New Construction
Results
Milwaukee, WI 53202

Paving Work
New Construction
Results
Milwaukee, WI 53202

Bioswale
New Construction
Results
Milwaukee, WI

2020 Asphalt Pavement Repair
Results
Less than $69,000 est. value
Cedarburg, WI 53012

Stewart Avenue Resurfacing
Results
Wausau, WI 54403

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

Road Repairs - Entrance Lot C to Sunset Campgrounds
Results
Less than $461,000 est. value
Kansasville, WI 53139

2020 Concrete Pavement Maintenance and Repairs
Results
Less than $78,000 est. value
Milton, WI 53563

CTH 'G' Street Construction
Results
Egg Harbor, WI 54209

Last Updated 05/15/2021 01:01 AM
Project Title

Bonduel - Cecil, Mutzy Lane - STH 22;

Physical Address View project details and contacts
City, State (County) Bonduel, WI   (Shawano County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 310 CY; Borrow, 60 CY; Base Aggregate Dense, 2,600 Ton; Marking Epoxy, 76,430 LF; Construction Staking, 22,677 LF; Construction Staking, 6 Each; Construction Staking, 1 LS; Culvert Pipe, 216 LF 24”, 116 LF 30“, 112 LF 84“; Pipe Arch, 204 LF 77” X 52”; Concrete Curb and Gutter, 20 LF; Beam Guard, 275 LF; Beam Guard Energy Absorbing Terminals, 4 Each; Asphaltic Surface, 65 Ton; HMA Pavement, 10,600 Ton; Removing Asphaltic Surface Milling, 85,800 SY; Tack Coat, 4,730 Gals

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Storm Drainage Structures.
Division 34 - Transportation, Roadway Construction, Vehicle Barriers, Vehicle Guide Rails.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents