Similar Projects
Reported | 11/19/2020 12:00 AM |
Project Title | Mile 3 Road Widening Water Line Relocation Project |
Physical Address | View project details and contacts |
City, State (County) | Palmview, TX 78573 (Hidalgo County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project: Texas Department of Transportation (TxDOT) will be widening Mile 3 Road to a four land divided curb & gutter roadway from Tom Gill Road to Goodwin Road (FM 492) for a total of 3.30 Miles and will be project CSJ: 0921-02-321. Agua Special Utility District’s project will Consist FM 492 Water Treatment Plant Water Recovery and Waste Process Improvements: Work of the Project includes Water Recovery and Waste Process Improvements at the FM 492 Water Treatment Plant (WTP). The improvements consist of, but is not limited to, replacing mechanical deficiencies at the forty (40) foot diameter water recovery basin (water saver) and include replacing the existing Scraper rake with sludge thickener, progressive cavity pumps and submersible pumps, rapid mix blowers, air piping, air valves, etc. to make the WTP more reliable. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |