Similar Projects
Last Updated | 04/15/2022 02:48 PM |
Project Title | Integrated Solid Waste Management |
Physical Address | View project details and contacts |
City, State (County) | Marietta, GA 30069 (Cobb County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Hauling |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The contractor shall empty MSW containers/dumpsters in accordance with Appendix A, Table A3, for the first 30 days of performance. The contractor shall establish initial vehicle routes and collection schedules upon contract award. They are to be submitted to the Contracting Officer (CO) and Contracting Officer Representative (COR) no less than five (5) calendar days prior to start of contract performance. (CDRL A002) The contractor may propose adjustments to the schedule at any time but as a minimum the COR and contractor shall monitor fill capacities during the first 30 days of performance and during one other period to be agreed upon during the same performance period, in order to determine if adjustments to container size, routes, or frequencies should be made to provide the minimum number of pickups necessary to maintain a healthy, vector free environment and prevent waste container overflow. No changes are allowed to the schedule or haul route without CO or COR coordination. Historical frequency tables are located at Appendix A, Table A3. When the contractor completes service at a location there shall be no litter, waste, and recyclable material on the ground within a 10 foot radius of the container. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |