Similar Projects
Sacramento Weir Widening Construction Project
Alteration
Design
$100,000,000 to $250,000,000 est. value
West Sacramento, CA 95691

Floating Dock Replacement at New Melones Lake
Term Contract
Design
$5,000,000 to $10,000,000 est. value
Sonora, CA 95370

Floating Dock Replacement at New Melones Lake
Alteration
Bidding
$500,000 to $1,000,000 est. value
CA

Moss Landing Jetty Repair
Term Contract
Bidding
Moss Landing, CA 95039

Z--Golden Gate National Recreation Area - Stabilize Alcatraz Wharf
Term Contract
Post-Bid
$10,000,000 est. value
San Francisco, CA

Suisun Marina Dock Box Replacement Project
Alteration
Post-Bid
$225,000 est. value
Suisun City, CA

Antioch Marina Boat Launch Ramp Dock Repair
Infrastructure
Results
$152,000 est. value
Antioch, CA 94509

Installation of Ada Access Ramps at Various Locations
Alteration
Results
$99,000 est. value
Loma Linda, CA

Stearns Wharf Public Balcony Repair
Infrastructure
Bidding
$30,000 est. value
Santa Barbara, CA 93101

Pavement Maintenance and Repairs
Alteration
Post-Bid
$700,000 to $800,000 est. value
Solana Beach, CA

Harrison Emergency Shelter Project - Phase 2
Renovation, Alteration
Results
$375,000 to $475,000 est. value
Corona, CA

Pacifica Pier Handrail Repair Project
Infrastructure
Bidding
$20,000 est. value
Pacifica, CA

Military Ocean Terminal Concord (MOTCO) Boat Ramp
Alteration
Post-Bid
$1,000,000 to $5,000,000 est. value
Concord, CA

Residential Street Repair Program
Infrastructure
Results
Santa Ana, CA

Rapid Response Boat Launch Project
Infrastructure
Bidding
$600,000 est. value
Stockton, CA

Last Updated 04/26/2022 05:26 AM
Project Title

ADA Boat Access at Vasona Lake County Park

Physical Address View project details and contacts
City, State (County) Los Gatos, CA 95032   (Santa Clara County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $992,622
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of Work of this Contract will consist of, but may not be limited to, the following: 1. Three Finger Dock a. Remove the existing three finger dock, piles, and gangway b. Furnish and install new piles, ADA-compliant dock, and ADA-compliant gangway; anchor new gangway to existing concrete pad. c. Install new steel gate at the entrance to the three finger dock. d. Remove existing handrail and install new ADA-compliant handrail leading to three finger dock. 2. Single Finger Dock a. Remove the existing single finger dock, piles, and gangway b. Furnish and install new piles, single finger ADA-compliant dock, ADA-compliant gangway, ADA-compliant kayak launch (with transfer bench, slide board, and railing system), and reinforced concrete pad; anchor new gangway to new concrete pad. c. Install new steel gate and fencing at the entrance to the single finger dock. 3. Civil Work a. Install asphalt and concrete as required to construct an ADA-compliant pathway from the parking lot to the proposed docks. Remove existing asphalt, concrete, and landscaping as needed to construct the proposed improvements. b. Restripe existing ADA parking stalls as standard parking stalls, stripe proposed ADA parking stalls, and restripe “DO NOT ENTER” striping. c. Remove curb and install landscaping as required to construct self retaining area for storm water treatment.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents