Similar Projects
Pre-Construction Engineering Services for the Crack Sealing Project
Post-Bid
Duchesne, UT

Engineering Services for the Duchesne County Road Department Chip Sealing Project
Infrastructure
Post-Bid
UT

Moenave Trail Improvements
Results

300 West Reconstruction from 900 South to 2100 South
Results

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

2021 Pavement Management On-Call Contract
Results
Duchesne, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

S Roadway Improvements
Results

2021 Street Reconstruction Project
Infrastructure
Post-Bid
$650,000 est. value
Roosevelt, UT

Mountain Home Road
Infrastructure
Results
$1,500,000 to $3,000,000 est. value
UT

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

2021 Chip Seal Project
Infrastructure
Results
$1,700,000 est. value
Duchesne, UT

Pole Line Road Resurfacing
Infrastructure
Results
$694,260 est. value
Duchesne, UT

East River Road Overlay
Infrastructure
Results
$4,404,480 est. value
Duchesne, UT

Udot Region 4 Wash Rack Installation Various Locations
Term Contract, Infrastructure
Results

Reported 06/29/2022 10:26 AM
Project Title

RFP Engineering - Ute Way Myton

Physical Address View project details and contacts
City, State (County) Myton, UT   (Duchesne County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected September 2022
Bids Due View project details and contacts
Estimated Value $380,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work and paving for a road / highway in Myton, Utah. Working plans call for site work for a road / highway; and for paving for a road / highway. The successful firm will utilize approved (PS&E) plans, specifications and construction cost estimate to reconstruct approximately 0.25 miles of rural streets on Route 49 (Ute Way). The work shall include but not necessarily limited to the presentation of a public awareness meeting, bidding assistance and assessment of bids, support in contractor award, construction inspection, materials testing, as-built documents, review and recommendation of contractor progress payments, punch listing incomplete items of work and contract close out.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents