Similar Projects
Storage Shed
New Construction, Infrastructure - 1,200 SF
Bidding
$300,000 CJ est. value
Vineland, NJ 08360

2022 Citywide Drainage Improvements - Various Locations
Infrastructure
Bidding
$400,000 CJ est. value
Vineland, NJ 08360

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Cold Water Meters 5/8" Thru 2"
Infrastructure
Post-Bid
Vineland, NJ

Directional Drilling Services
Term Contract, Infrastructure
Results
$200,000 est. value
Vineland, NJ

Cumberland Regional High School Reconstruction of the Existing Student Parking Lot and Bus Drop Off Area
Infrastructure
Results
$3,264,916 CJ est. value
Bridgeton, NJ 08302

NJ Transit Raritan River Bridge, GC-02
Demolition, New Construction, Infrastructure
Pending Verification
$143,924 CJ est. value
Newark, NJ 07102

Newcomb Senior Apartments
New Construction, Infrastructure - 124,959 SF
Pending Verification
$20,000,000 CJ est. value
Vineland, NJ 08360

Construction of Vineland Fire Headquarters - Station 6
New Construction, Infrastructure
Bidding
$15,000,000 CJ est. value
Vineland, NJ 08360

Water Main Extension (Northeast Avenue to Forest Grove Road)
Infrastructure
Post-Bid
Vineland, NJ 08360

Rehabilitate Parking Lots at Buildings 203, 17 and 316
Infrastructure
Results
$247,569 CJ est. value
Millville, NJ 08332

Four Seasons At Millville - Phase 3
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Millville, NJ 08332

Water Main Installation and Resurfacing Marion Street and Parker Street
Infrastructure
Bidding
$2,000,000 CJ est. value
Bridgeton, NJ 08302

Fabrication and/or Installation of Structural Steel & High and Low Pressure Pipe Work
Infrastructure
Post-Bid
$190,000 CJ est. value
Camden, NJ 08104

Rowan Medicine Vineland - Site Work Rowan University
Infrastructure
Results
$1,467,053 CJ est. value
Vineland, NJ 08360

Last Updated 01/17/2023 06:18 AM
Project Title

Replacement of South Avenue 8 Inch Force Main

Physical Address View project details and contacts
City, State (County) Bridgeton, NJ 08302   (Cumberland County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $521,933 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Bids must be made on standard proposal forms in the manner designated therein required by the Specifications, must be enclosed in sealed envelopes bearing the name and address of bidder and name of project on outside and addressed to the City of Bridgeton and must be accompanied by a Certified Check or Bid Bond for not less than ten percent (10%) of the total amount bid, provided said check need not be more than $20,000 nor shall not be less than $500 and be delivered at the place on or before the hour named above. Consent of Surety from an approved Surety Company must also be submitted with the Bid. Please be advised that any bidder who fails to submit a "Consent of Surety" with the bid can anticipate that the bid submitted will be automatically rejected. Pursuant to C57, Laws of 2004 (s1778) all business organizations that do business with a local contracting agency are required to be registered with the State and provide proof of that registration to the contracting agency before the contracting agency may enter in a contract with the business. All bidders shall adhere to the information as classified as "New Jersey Business Registration Requirements". Bidders are required to comply with the requirements of N.J.S.A. 10:5-31 et seq. and N.J.A.C. 17:27. This is a prevailing wage project and all bidders are required to comply with the New Jersey Prevailing Wage Act of N.J.S.A. 34:11-56.25 et seq. By order of the City of Bridgeton, New Jersey The City of Bridgeton reserves the right to reject any or all Bids and to waive immaterial information. Completion Date: 90 Calendar Days

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents