Similar Projects
Last Updated | 03/21/2023 07:09 PM |
Project Title | HVAC Automation Controls Upgrades for Calaveras County Adult Detention Facility - Admin |
Physical Address | View project details and contacts |
City, State (County) | San Andreas, CA 95249 (Calaveras County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Results, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $154,532 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Proposals must be delivered to Calaveras County Administration, 891 Mountain Ranch Road, Building A, San Andreas, CA 95249, no later than 3:00 PM on March 16, 2023. Provide a detailed bid for the removal and replacement of the existing Siemens BACnet automation control system with new non-proprietary automated control system for the existing HVAC system at the location noted above. This will be a complete retrofit project of any remaining controls and accessories that will be required to operate and be compatible with several other recently completed non-proprietary system upgrades. Any inquiries, suggestions, or request concerning interpretation, clarification, or additional information pertaining to the ITB shall be made in writing through the Public Purchase website: The job will be bid at prevailing wage. Removaland replacement ofthe existing Siemens BACnet automation control system withnew non-proprietary automated control system for the existing HVAC system at the location noted above. This will be a complete retrofit project of any remaining controls and accessories that will be required to operate and be compatible with several other recently completed non-proprietary system upgrades. Provide system integration of the existing Liebert monitoring panel at the (3) computer room air conditioning units (CRAC) Supply & install new VAV controllers & actuators where applicable Supply & install new zone temp sensors for VAV controllers where applicable Supply & install new exhaust fan controllers where applicable Supply & install new split system controllers where applicable Supply & install new plant controller with I/O module for recently converted air handler unit A-l Provide new core software to support max 100 devices including maintenance agreement of 1 year for upgrades and system releases where applicable Provide complete system programming integration of both existing and new equipment for a seamless transition and full control due to occupancy use including graphics where applicable Supply & install new ports and ethernet ports including backup & restore where applicable Supply & install all required conduits, cabling, raceways, tie-in, control accessories & equipment including termination of preceding system, new trending, and alarm installation where applicable Provide 60-day repair, adjustment and consulting period as needed/requested by facilities employees and engineers |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |