Similar Projects
Last Updated | 05/23/2023 02:25 PM |
Project Title | APA West Valley City - Campus 2 New Classroom Addition |
Physical Address | View project details and contacts |
City, State (County) | West Valley City, UT 84119 (Salt Lake County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Elementary School, Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected April 2023 |
Bids Due | View project details and contacts |
Estimated Value | $290,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | American Preparatory Academy, West Valley City - Campus 2, New Classroom Addition. The purpose of this RFP is to enter into a contract to provide: all materials, goods and services to complete Area B as defined in the detailed plans and scope of work, at a campus location in West Valley City, for a Utah Public Charter School. Project Location: 3636 West 3100 South, West Valley City, Utah 84120. It is anticipated that this RFP will result in a single contract award to the responsive and responsible offeror with the highest score justified by the procurement code. The contract resulting from this RFP will be for up to ONE (1) year. This project was commenced in 2018 and was only partially completed. The project included (2) building areas that are referenced as "Area A" and Area "B" in the plans. The project also included site work around both Areas A and B. Area A and the associated site work is complete and is occupied. Area B and its associated site work are not complete. The Owner wishes to complete the project as soon as possible. Question Submission Close Date 2/15/2023 3:00 PM MST The project included (2) building areas that are referenced as "Area A" and Area "B" in the plans. The project also included site work around both Areas A and B. Area A and the associated site work is complete and is occupied. Area B and its associated site work are not complete. The Owner wishes to complete the project as soon as possible. AREA B - The building shell of Area B is nearly complete. The exterior walls, floor and roof structure, and floor slabs appear complete except a few minor items. Exterior glass is partially complete. Roofing and insulation is 0% complete. A bridge connecting Area B with a main classroom wing has only the concrete columns placed. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |