Similar Projects
Construction Variable Width Pav`R. Resurfacing W/ Hot-Mix Asphalt Surface
Post-Bid
Bensenville, IL

Sitework, HVAC & Classroom Improvements
Post-Bid
Burr Ridge, Willowbrook, IL 60527

Addison Campus Parking Lot Improvements
Results
Addison, IL 60101

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

2021-2023 Street Sweeping Program
Post-Bid
Roselle, IL

The Improvement Consists of Cleaning (Nighttime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

RR-20-4552 - Structural Rehabilitation
Results
IL

2021 MFT Road Program
Post-Bid
Burr Ridge, IL

Water Main Replacement
Results
Less than $1,700,000 est. value
Glendale Heights, IL 60139

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Earthwork
Post-Bid
Glendale Heights, IL 60139

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

Last Updated 07/22/2022 09:35 AM
Project Title

Morton Road Widening

Physical Address View project details and contacts
City, State (County) Carol Stream, IL 60188   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $565,931 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Full pavement removal, excavation, aggregate sub-base improvements, storm sewer removal and replacement, milling existing HMA to be replaced with HMA binder and surface, removal of existing storm sewer and structures, curb and gutter, adjustment of structures, pavement markings, grading and related restoration. Site Directions: From I355, west on North Avenue (IL Route 64), left on Morton Road to site. Pre-Qualification: Yes

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents