Similar Projects
New Bus Depot
New Construction
Design
University Heights, OH

Benedictine High School Renovations
Renovation
Bidding
$4,000,000 est. value
Cleveland, OH 44104

Hope Academy Church Expansion
Renovation - 11,000 SF
Post-Bid
Cleveland, OH 44105

Elementary School Building Consolidation and Construction of New PK-5 Project
New Construction
Post-Bid
$58,000,000 est. value
North Olmsted, OH

2020 Machining, Manufacturing, Design and Development Alterations - Shaker Heights High School
Renovation
Results
$164,940 est. value
Shaker Heights, OH 44120

Brush High School Renovation Phase 2
Renovation - 1,151 SF
Results
Lyndhurst, OH 44124

St. Martin de Porres High School - Phase II
New Construction - 25,000 SF
Construction
$8,279,000 est. value
Cleveland, OH 44103

Yeshiva Derech Hatorah
Renovation
Construction
South Euclid, OH 44121

Parma Opportunity Center
Results
Less than $381,100 est. value
Parma, OH 44134

Millridge Elementary School
Construction
Highland Heights, OH

Ben Franklin Renovation Phase II
Renovation - 15,023 SF
Results
Less than $750,000 est. value
Cleveland, OH 44109

Beachwood School District 2020 Improvements
Results
Less than $5,000,000 est. value
Beachwood, OH 44122

Disaster Recovery Services
Results

Wilmore Elementary School Property Developer
Results
Euclid, OH 44123

Developer for Central School Property 27 Public Square
Results
Brecksville, OH

Reported 10/25/2021 03:33 PM
Project Title

Warrensville Heights Segment 2F

Physical Address View project details and contacts
City, State (County) Warrensville Heights, OH 44128   (Cuyahoga County)
Category(s) Education
Sub-Category(s) Elementary School, Middle/Senior High School
Contracting Method
Project Status Construction Commenced third quarter 2021
Bids Due View project details and contacts
Estimated Value $38,259,699
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Selective Demolition/Addition to Warrensville Heights High School to house grades 6-12 for 1,048 students: The total building area is to be approximately 208,161 sf (co-funded) with a total co-funded budget of approximately $36.4M, not including LFIs; the new addition is 137,042 sf. The project includes partial demolition (134,052 sf) of the existing high school. The existing 2002 Recreation Center will remain; however, no co-funded renovation work is included. Anticipated LFI projects; Total budget for all LFIs is approximately $30.0M. 10 Additional Academic classrooms (2 for MS and 8 for the HS (approx. 8,100 total sf) New Firefighting/Emergency Med Services and Graphic Design CT space (approx. 3,100 total sf) Existing 1964 Auditorium Renovation (5,400 sf) plus new lobby area/support spaces Existing 2002 Science Wing Renovation (23,500 sf) New Community Spaces: Planetarium (approx. 1,200 sf), Enlarged Lobby & Clinic spaces. New (relocated) Stadium with 1,500 seats New Sports Arena to seat 2,100 (approx. 25,000 total sf) New Bus Garage/Maintenance Facility (approx. 6,000 sf) • Additional Parking Project scope includes Abatement & Demolition of the existing 4 schools; Total budget is approximately $1.9M: • Warrensville Heights Middle school (located at 4285 Warrensville Center Road, Warrensville Heights, OH 44128) with a co-funded budget of approx. $645K. • Westwood Elementary School (located at 19000 Garden Blvd.) with a total budget of $364K • John Dewey Elementary School (located at 23401 Emery Road) with a total budget of $442K; • Eastwood Elementary School (located at 4050 Eastwood Lane) with a total budget of $441K. It is anticipated that the students will remain in the existing schools until the new school is completed. An early site package GMP is required and is to begin Fall of 2020; main building construction to begin Spring 2021.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents