Similar Projects
AutoZone #5857 / Conway
New Construction, Infrastructure - 16,600 SF
Bidding
$4,000,000 CJ est. value
Conway, AR 72032

AutoZone #5857 / Conway
New Construction, Infrastructure - 16,600 SF
Bidding
$4,000,000 CJ est. value
Conway, AR 72032

2022 Asphalt
Term Contract, Infrastructure
Post-Bid
AR

High Performance Cold Mix
Infrastructure
Post-Bid

Statewide CLRS Improvements
Infrastructure
Results

Beryl Road Improvements
Infrastructure
Results
AR

Hogan Lane Absolute Storage
New Construction, Infrastructure - 50,000 SF
Pending Verification
$4,000,000 CJ est. value
Conway, AR 72034

Donaghey Avenue Multi Family Development
New Construction, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Conway, AR 72034

Mill Bridge Road Waterline Extension
Infrastructure
Bidding
$160,000 CJ est. value
Greenbrier, AR 72058

Asphalt Overlay of All Paved Surfaces at Carl Stuart Middle School
Infrastructure
Post-Bid
$290,000 est. value
Conway, AR 72034

Mayflower Overlay
Infrastructure
Results
Mayflower, AR

The Bird's Nest Subdivision
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Conway, AR 72034

Dry Bores for Conway Corporation
Infrastructure
Post-Bid
$200,000 est. value
Conway, AR

Hwy. 64 - South (Overlay)
Infrastructure
Results
AR

1600 Place PUD
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Conway, AR 72032

Last Updated 03/18/2023 01:05 AM
Project Title

N. Of Beaver Fork Lake - Hwy. 65 (S)

Physical Address View project details and contacts
City, State (County) Conway, AR 72032   (Faulkner County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,725,438 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Purpose of This Project is to Widen From 2 Lanes to Three Lanes With 6'-0" Shoulders and Overlay With Achm Surface Course Approximately 0.048 Miles and Retain and Overlay With Achm Surface Course Approximately 8.357 Miles of Highway 25 in Faulkner County. This Project Consists of Removal and Disposal Items, Earthwork, Aggregate Base Course, Achm Binder and Surface Courses, Cold Milling Asphalt Pavement, Achnm Patching of Existing Roadway, Approach Gutters, Scarifying Concrete Pavement, Maintenance of Traffic, Minor Drainage, Erosion Control, Guardrail, Rumble Stripes, Pavement Marking, and Misc. Items. Routes : 25 Sections: 0 County : Faulkner Length : 8.405 miles in length. The Successful Bidder Will Be Required to Complete This Contract on or Before November 21, 2023. Questions Pertaining to Projects During the Advertisement Period Should Be Addressed to the Program Management Division at Pmd@ardot.gov. the Deadline to Submit a Question Is the Wednesday Prior to the Scheduled Letting Date. a Question Submitted After the Close of Business on the Wednesday Prior to the Scheduled Letting Date May Not Receive a Response. In Order to Have a Bid Considered, Contractors Must Furnish a Proposal Guaranty Consisting of Either a Bidder's Bond or a Certified or Cashier's Check in the Amount of Five Percent (5%) of the Total Amount Bid. in Order for a Bond to Be Acceptable to the Department, the Company Issuing the Bond Must Be Named in the Department of Treasury Listing of Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies. the Underwriting Limitation of the Bonding Company Shall Be Adhered to. Any Excess (Between the Face Amount of the Bond and the Underwriting Limitation) Shall Be Protected by Reinsurance Provided by an Acceptable Reinsuring Company. These Contracts Are Subject to Normal Prequalification, Licensing and Bonding Requirements, Applicable Labor Laws, Non-discrimination Provisions, Wage Rate Laws and Other Federal Laws Including the Fair Labor Standards Acts of 1938. the Work Hours Act of 1962 and Title Vi of the Civil Rights Act of 1964 Also Apply. The Arkansas Department of Transportation Complies With All Civil Rights Provisions of Federal Statutes and Related Authorities That Prohibited Discrimination in Programs and Activities Receiving Federal Financialassistance. Therefore, the Department Does Not Discriminate on the Basis of Race, Sex, Color, Age, National Origin, Religion, or Disability, in the Admission, Access to and Treatment in Department's Programs and Activities, as Well as the Department's Hiring or Employment Practices. Complaints of Alleged Discrimination and Inquiries Regarding the Department's Nondiscrimination Policies May Be Directed to Joanna P. Mcfadden, Section Head - Eeo/dbe (Ada/504/title Vi Coordinator), P. O. Box 2261, Little Rock, Ar 72203, (501) 569-2298, (Voice/tty 711), or the Following Email Address: Joanna.mcfadden@ardot.gov. The Department Reserves the Right to Reject Any or All Bids and to Waive Any Formalities. ARDOT - N. Of Beaver Fork Lake - Hwy. 65 (S)

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents