Similar Projects
UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

UFSA Flooring - Stations 106 and 252
Bidding
Eagle Mountain, Salt Lake City, UT 84005

Midway City Town Hall and Community Center Flooring
Post-Bid
Midway, UT 84049

Wilsonart Solid Surface Sheets
Term Contract
Post-Bid
Farmington, UT 84025

Roof Replacement and Flooring Replacement
Results
Provo, UT

Athletic Flooring, Weight and Fitness Equipment and Golf/Multi-Sport Simulator for Ben Lomond High School Athletic Center
Results
Ogden, UT 84404

Fair Grounds
Bidding
Paragonah, UT 84760

Hospital Kitchen Flooring Replacement, Building 522
Post-Bid
Less than $358,562 est. value
Salt Lake City, UT

Floor Finish (2020)
Results
Alpine, UT 84042

Edge of Cedars Visitors Center Carpet
Bidding
$148,000 est. value
Ballard, UT

Correctional Facility Kitchen Floor Solution
Post-Bid
Ogden, UT 84401

SSD Gym Floor Refinish
Results
$20,000 to $30,000 est. value
Richfield, UT 84701

Construction Job Notice: Floor Coverings, South Kearns and Roosevelt Schools
Post-Bid
Kearns, UT 84118

Mill Creek Sediment Basin Concrete Floor Project
Results
Farmington, UT 84025

Statewide Flooring and Installation
Post-Bid
Salt Lake City, UT 84114

Reported 10/01/2020 12:00 AM
Project Title

Mulligan`S Miniature Golf Carpet Replacement

Physical Address View project details and contacts
City, State (County) South Jordan, UT 84095   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The City of South Jordan seeks proposals from experienced and qualified contractors and carpet installers to remove and replace the carpet for all 36 holes of Mulligans two 18-hole miniature golf courses. 1. Removal: The contractor will be responsible for removing current carpet, off-site disposal of the current carpet and debris, preparing the subsurface areas which includes, but is not limited to removing/sanding/buffing the old glue and rough areas, power washing the subsurface if needed, and filling in, sanding, and smoothing cracks or defects that would undermine the quality of the course or the long-term durability of the carpet. Each hole will need to be inspected by the golf course manager or a city staff member before and after the carpet is laid. 2. Replacement: Replace each hole with designated carpets using the design layout provided. (Contractor may propose other brands with carpet/turf specifications equal to the specifications uploaded as part of this RFP.) Install city-provided rubber tee mats in the designated area in each hole. 3. Work site must be kept reasonably clean and safe from hazards when unattended. Debris and material must be thoroughly cleaned up at the completion of each phase. 4. The contractor must complete the scope of work within 45 days from Notice to Proceed. 5. The contractor must adapt the replacement schedule to allow all 36 holes of the course to be open on weekend days, including Friday, Saturday, and Sunday. Project schedule requires two separate phases; the completion of one 18-hole course (removed, prepared, replaced, and playable) prior to the commencement of the other 18-hole course. 6. Proposals for this work shall include the best warranty on the carpet product that is available, and the contractor must warranty the application and workmanship for at least one year. 7. Proposals shall include specifications for the turf carpet products, a description of the process for removing and applying the new turf, the adhesive specifications, and a timeline for accomplishing this project. Also include any anticipated delays in ordering or receiving the turf carpeting. 8. The contractor must continually communicate and coordinate the replacement schedule with the Golf Course Manager and notify him of any delays in the schedule.

Details

Division 09 - Finishes, Flooring, Carpeting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents