Similar Projects
Farmstone Meadows Residential Subdivision
New Construction, Infrastructure
Conception
$38,300,000 CJ est. value
Willow Springs, NC 27520

Woodleaf
New Construction, Infrastructure
Conception
$191,700,000 CJ est. value
Smithfield, NC 27577

Clayton Village Center Mixed Use Development
New Construction, Infrastructure - 80,000 SF
Design
$25,000,000 CJ est. value
Clayton, NC 27520

Whitley Townes
New Construction, Infrastructure
Design
$32,200,000 CJ est. value
Smithfield, NC 27577

Pine Level Wastewater I&I Remediation
Infrastructure
Bidding
$300,000 CJ est. value
Selma, NC 27576

Community Building Rehabilitation
Infrastructure, Renovation
Bidding
$250,000 CJ est. value
Selma, NC 27576

RFQ D/B - Timothy G. Broome Water Treatment Plant Expansion
Addition, Demolition, Infrastructure
Post-Bid
$55,200,000 CJ est. value
Smithfield, NC 27577

Hangar Site Development and Parking Lot Expansion - Rebid
Demolition, Infrastructure
Post-Bid
$4,445,852 CJ est. value
Smithfield, NC 27577

Firearms Training Facility Berm Repair
Alteration
Results
Four Oaks, NC 27524

Smithfield Middle School New Canopy Entrance
Infrastructure
Results
$303,000 CJ est. value
Smithfield, NC 27577

NC 96 Four Oaks Economic Development Water Main Extension
Infrastructure
Construction
$1,724,038 CJ est. value
Smithfield, NC 27577

Wilder's Market
Demolition, New Construction, Infrastructure - 4,500 SF
Pending Verification
$4,000,000 CJ est. value
Clayton, NC 27520

Country Lane Residences
New Construction, Infrastructure
Pending Verification
$45,000,000 CJ est. value
Clayton, NC 27520

New Middle School - Johnston County Schools
New Construction, Infrastructure
Conception
$70,000,000 CJ est. value
Selma, NC 27576

River Mews Estate
New Construction, Infrastructure
Design
$275,000,000 CJ est. value
Clayton, NC 27520

Last Updated 04/05/2023 09:07 AM
Project Title

Clayton High School Auditorium

Physical Address View project details and contacts
City, State (County) Clayton, NC 27520   (Johnston County)
Category(s) Education, Entertainment/Recreation, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Site Development, Theaters/Auditoriums
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $10,437,250 [brand] Estimate
Plans Available from Architect - 01/22/23
Owner View project details and contacts
Architect View project details and contacts
Description

As of  April 5, 2023, this project has not yet been awarded. A timeline or award has not yet been established. The Owner will receive sealed bids until the bid time and date at the location below for the +/- 17,800 sq. ft. new Auditorium Addition for the following work: Single-Prime (all trades) The Owner will consider Single-prime (all trades) bids. The provisions of North Carolina General Statutes 143-128, including guidelines for singleprime contracting options and minority business enterprise participation, shall be observed in letting and executing the Work. Applicable provisions of North Carolina General Statutes Chapter 87 shall be observed in the receiving of bids and awarding of contracts. Bidders must submit with each bid acceptable bid security in the form of a bid bond, a certified check, a cashier's check, or a money order (no cash) in the name of the Owner in the amount of 5 percent of the bid amount. No bids may be withdrawn for a period of 60 days following opening of bids. The Owner reserves the right to reject any and all bids and to waive minor informalities and irregularities. Bid security shall be submitted with each bid in the amount of 5 percent of the bid amount. No bids may be withdrawn for the period disclosed in the Form of Bid. The Owner reserves the right to reject any and all bids and to waive minor informalities and irregularities. Addendum #1-#3 have been issued as of 2-16-2023. new 17,625 SF Auditorium at Clayton High School. The project consists of a new construction, site work, and minor renovation where the building ties in to the existing high school. The project will be constructed on an occupied campus and the safety of students, staff and visitors will remain the highest priority.

Details

17,800 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Partitions, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Projection Screens, Projectors, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating, Fixed Audience Seating.
Division 13 - Special Construction, Sound, Vibration, and Seismic Control.
Division 21 - Fire Suppression, Fire Suppression Systems Insulation, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Theatrical Lighting, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents