Similar Projects
8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Bidding
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Locating Subsurface Facilities
Alteration
Bidding
Riverside, CA 92519

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Southern Pump Station Project
Infrastructure
Post-Bid
$6,200,000 est. value
El Centro, CA 92244

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Grayson Well 69 (Replacing Well 274)
Infrastructure
Results
$2,449,000 est. value
Grayson, Modesto, CA 95363

Well and Lift Station Maintenance, District 02
Infrastructure
Bidding

Groundwater Treatment Plant Design-Build (Phase B)
New Construction, Infrastructure
Post-Bid
Anaheim, CA

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Camino Intertie Pressure Reducing Station
Infrastructure
Bidding
$650,000 to $700,000 est. value
Placerville, CA

Drilling and Construction of Well 32 and 33 Project
Infrastructure
Post-Bid
Colton, San Bernardino, CA 92324

Treated Water Booster Pumps
Alteration
Results
CA

Better Market Street - Phase 1
Infrastructure
Bidding
$29,500,000 est. value
San Francisco, CA 94158

Well Pumping Plant 31, Fogg Street
Infrastructure
Post-Bid
$1,600,000 to $1,800,000 est. value
Colton, CA 92324

Groundwater Flush to Waste Project
Infrastructure
Results
Sacramento, CA 95838

Last Updated 11/08/2021 10:32 AM
Project Title

City of Poway Treated Water Facilities and Redundant Pipeline Project

Physical Address View project details and contacts
City, State (County) Poway, CA 92064   (San Diego County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,310,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of a new Forebay Tank, Booster Pump Station, and 36-inch diameter treated water pipeline from the POW-5 Flow Control Facility to the Forebay Tank/Booster Pump Station and then to the City’s Clearwell Bypass Pipeline.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents