Similar Projects
Intersection
Infrastructure
Bidding
WI

Plainfield - Stevens Point, Structures
Infrastructure
Bidding
WI

Asphalt Milling Services
Post-Bid
Racine, WI

M1lb--Asphalt Repair Services
Post-Bid
Milwaukee, WI 53295

Resurface & Expand Privately Owned Vehicle Parking - General
Results
$340,000 est. value
Eau Claire, WI 54702

Wisconsin Street Reconditioning
Results
New Lisbon, WI 53950

2021 Mill Road Seminary Street Resurfacing and Weed Street Storm Sewer Replacement
Infrastructure
Bidding
Fox Lake, WI 53933

Seal Coat
Post-Bid
Marinette, WI

Crack Routing and Sealing
Results
Madison, WI 53703

2021 Roadway Maintenance
Infrastructure
Bidding
Barneveld, WI

Concrete Pavement Joint Cleaning and Sealing
Post-Bid
Wisconsin Rapids, WI 54494

Lacrosse - Westby, Brickyard Lane to CTH M
Results
La Crosse, Westby, WI 54602

Road Improvements Chip and Crack Seal
Post-Bid
Windsor, WI 53598

Village of Brandon, CTH TC - WCPL
Results
Brandon, WI 53919

2021 Asphaltic Concrete Pavement
Post-Bid
Reedsburg, WI 53959

Last Updated 07/19/2021 09:31 AM
Project Title

1058th Avenue Paving & 970th Avenue Chip Sealing

Physical Address View project details and contacts
City, State (County) Wheeler, WI   (Dunn County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The paving project is located in Section 23 Town of Otter Creek on 1058th Avenue at 690th Street going east approximately 1/2 miles to the gate at WoodWind Park. This bid is for warm mix pavement using 4LT5834S oil. Pavement will be 20’ wide and have a compacted thickness of 2” The chip sealing project is located in Sections 33 and 34 in the Town of Otter Creek on 970th Avenue at 670th Street going west to 640th Street and will include approximately 75’ going north on 670th Street at the intersection with 970th Avenue. Hot liquid asphalt will be used. 3/8” minus dark fractured granite chips will be used.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents