Similar Projects
Pepper Hall Tract
Conception
Bluffton, SC

Redwood Living Rental Homes
New Construction
Conception
Mauldin, SC 29607

Riverland Oaks
New Construction
Design
James Island, SC

Windhaven
New Construction
Design
Tega Cay, SC 29708

Statement Of Qualifications For HVAC And Electrical Services
Renovation
Bidding

Statement Of Qualifications For HVAC And Electrical Services
Renovation
Bidding

Metanoia Community Development Corporation - Four Affordable Rental Units
New Construction
Post-Bid
North Charleston, SC

Single Family Home Rehabilitation
Post-Bid
Surfside Beach, SC 29575

1311 Malloy Street Rehabilitation
Results
Florence, SC

14-F Allway Street Fire Damage Repair
Results
Less than $94,380 est. value
Charleston, SC 29401

Carrington
New Construction
Construction
Spartanburg, SC

The Parks of Carolina Forest
New Construction
Construction
Myrtle Beach, SC

Hammett Creek
New Construction
Pending Verification
Lyman, SC

Dermot
New Construction
Pending Verification
Inman, SC

River Oaks Golf Plantation Homes
New Construction
Conception
Myrtle Beach, SC 29579

Reported 03/08/2019 01:24 PM
Project Title

Ansley Park

Physical Address View project details and contacts
City, State (County) Indian Land, SC 29720   (Lancaster County)
Category(s) Residential
Sub-Category(s) Single-Family Homes
Contracting Method
Project Status Construction Commenced fourth quarter 2018
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Individual Lots to be Sold.
Details 310 Single-Family Homes, New Construction, 157 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents