Similar Projects
Fire Panel Replacement
Post-Bid
Phoenix, AZ 85008

Fire Alarm System Upgrade Project at Willcox Middle School
Post-Bid
Willcox, AZ 85643

Sunnyside High School Fire Alarm Replacement Project
Results
Tucson, AZ 85706

Fire Protection Equipment Inspection Services
Results
$65,000 est. value
Tucson, AZ

Omega Alpha Academy - Fire Alarm/Mass Notification System
Alteration
Construction
Douglas, AZ 85607

Rio Rico High School SFB BRG for Fire Alarm Replacement
Post-Bid
Rio Rico, AZ 85648

Onsite Fire System Upgrade for Liberty Elementary School
Results
Buckeye, AZ 85326

Kayenta Health Center Facility - Annual PM Fire Alarm Testing & Inspection
Post-Bid
Kayenta, AZ 86033

Flowing Wells High School Fire Alarm
Results
Tucson, AZ 85705

N--Fire Alarm System Repair
Post-Bid
Tuba City, AZ

Fire Suppression Inspection Services and Preventative Maintenance
Results
Casa Grande, AZ 85122

J--Bie/Aznn/Rpl Fire Alarm System
Post-Bid
Tuba City, AZ

Fire Sprinkler System Maintenance, Repairs and Related Services
Term Contract
Results
Oro Valley, Tucson, AZ 85705

Fire Alarm System Replacement
Post-Bid
Chinle, Fort Defiance, Kaibito, Kayenta, Sanders, Tuba City, AZ - Crownpoint, NM

Halon Fire Extinguisher Maintancence
Results
Tucson, AZ

Last Updated 06/28/2022 06:34 AM
Project Title

Dr. Daniel Bright School Sprinkler System Dry Pipe Upgrades

Physical Address View project details and contacts
City, State (County) Cottonwood, AZ 86326   (Yavapai County)
Category(s) Single Trades
Sub-Category(s) Fire Protection
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $330,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of Sprinkler System Dry Pipe Upgrades at Dr. Daniel Bright School, including the following: 1. Upgrades in the dry pipe sprinkler system in the attic and repair draft stops. 2. Work shall be done with minimal disruption to the finished interior of the school and minimal demolition of the existing school. The intent is to perform all work in the attic by accessing the space through existing vent openings in the mansard roof facias. 3. Patch any surfaces damaged by the work.

Details

Division 21 - Fire Suppression.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents