Similar Projects
Kendrick Elementary School Replacement
New Construction
Conception
Waco, TX

Allied Health And Sciences Building
New Construction
Conception
$55,000,000 est. value
Port Arthur, TX 77640

Heep Laboratory Renovation
Renovation
Design
College Station, TX 77840

Active Learning Center Construction
New Construction - 80,000 SF
Design
$60,000,000 est. value
Huntsville, TX 77340

Oliveira Student Services Center Second Floor Restroom Additions
Renovation, Addition
Bidding
Brownsville, TX 78520

UES Central Office First Floor Renovation Building #0496
Renovation
Bidding
College Station, TX 77843

Tarrant County Colleges - NW Campus GMP
New Construction
Sub-Bidding
Fort Worth, TX 76179

Ron Mafrige Field House Renovation
Renovation - 27,000 SF
Post-Bid
$11,000,000 est. value
Huntsville, TX 77340

SJC Central Campus Classroom Building
Post-Bid
Houston, TX

Construction Manager at Risk - Instructional Laboratory and Innovative Learning Building (ILSQ)
New Construction - 119,993 SF
Results
Less than $100,000,000 est. value
College Station, TX

CMAR UHD Student Wellness and Success Center
Results
Houston, TX 77204

Renovate Smith Research Building Construction Manager at Risk
Renovation
Construction
Houston, TX 77054

Southern Methodist University Bridwell Library Phase II
Renovation - 46,700 SF
Construction
University Park, TX 75205

Campus Expansion Plans
Addition
Pending Verification
McKinney, TX 75069

Borderlands Research Institute
New Construction
Pending Verification
$22,447,000 est. value
Alpine, TX 79830

Reported 03/02/2022 12:00 AM
Project Title

EB Evans Building Renovation

Physical Address View project details and contacts
City, State (County) Prairie View, TX 77446   (Waller County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids. Construction Management - CM at Risk.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $8,132,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed renovation of the E.B. Evans building includes academic classrooms and laboratories along with research laboratories and their support spaces, as well as a Nutritional Education Hub. The initial scope of the work includes renovation of spaces on the first floor and shelling the entire second floor as well as deferred maintenance in the form of building utilities and building envelope.

Details

College/University, Renovation.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents