Similar Projects
2020 CDBG Water System Improvement
Infrastructure
Bidding
$800,000 est. value
Dexter, NM

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

The Heredia Community Ditch Association
New Construction
Post-Bid
San Lorenzo, NM

Valle Del Rio Water System Improvements
Results
La Mesa, NM

Jacquez Road Line Extension
Results
$99,856 est. value
La Mesa, NM 88021

Water System Improvements
Post-Bid
$540,000 to $610,000 est. value
Tatum, NM

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Riverside Waterline and Spring Tank Replacement
Post-Bid
Ruidoso Downs, NM

Pena Blanca Water and Sanitation District Water System Improvements
Results
Pena Blanca, NM 87041

Lea County Airport Water and Sewer Extension
Post-Bid
Hobbs, NM 88240

Construction of the Union Del Llano Phase II Water System Improvements
Results
Llano, NM 87543

Engineering Services for Pinecliff Water and Sewer System Improvements
Post-Bid
Ruidoso, NM

Mountain View Waterline Extension
Results
$500,000 to $700,000 est. value
Moriarty, NM 87035

Water System Improvements - Phase III
Post-Bid
Melrose, NM

Utility On-Call
Term Contract
Results
$2,098,419 est. value
Los Lunas, NM 87031

Reported 05/18/2022 10:12 AM
Project Title

West Side Water Main Replacement I.H.S

Physical Address View project details and contacts
City, State (County) San Felipe Pueblo, NM   (Sandoval County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method
Project Status Construction Commenced April 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Construction of an 8" PVC water main and 10" PVC Connection, throughout the San Felipe Pueblo village to replace the existing system. The water main installation will include all Appurtenances, including required Fittings, Gate Valves, Fire Hydrants, Connections to Existing Water Main, and improvements to the existing Pumphouse Plumbing. Repairs of existing paved surfaces and restoration of unpaved surfaces are required. Two Concurrent projects, under separate contract to the Pueblo, will be required to be coordinated by the selected Prime Contractor with this Project's construction.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents