Similar Projects
Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Old Hickory Grove Road Water Main Improvements
Infrastructure
Design
$1,547,692 CJ est. value
Mount Holly, NC 28120

Old Hickory Grove Road Water Main Improvements
Infrastructure
Design
$1,547,692 CJ est. value
Mount Holly, NC 28120

Boulder Court Street Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gastonia, NC 28054

Boulder Court Street Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Gastonia, NC 28054

Advanced Metering Infrustructure
Post-Bid
Stanley, NC

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Avon Creek Greenway Extension
Results
Gastonia, NC

Health Department Pavement Rehabilitation
Results
Gastonia, NC

Lithium Processing Facility
New Construction, Infrastructure
Pending Verification
$500,000,000 CJ est. value
Gastonia, NC 28052

The Manor at Union Crossing
New Construction, Infrastructure
Pending Verification
$29,000,000 CJ est. value
Gastonia, NC 28054

New Hope Road Retail
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Gastonia, NC 28052

Bituminous Plant Mix Asphalt
Term Contract
Post-Bid

Boulder Court Street Improvements Project
Results
Gastonia, Ranlo, NC 28054

Last Updated 08/26/2022 02:32 AM
Project Title

Street Improvements: Resurfacing, Sidewalks, Drainage

Physical Address View project details and contacts
City, State (County) Mount Holly, NC 28120   (Gaston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing of all labor, material, equipment, supplies and supervision for the construction of the Street Improvement Projects. The City of Mount Holly is an equal opportunity municipality and invites small and minority contractors to bid. No BIDDER may withdraw his bid within 60 days of the date of bid opening without forfeiting the bid bond. The CITY reserves the right to waive any informality or to reject any or all bids. The BIDDER to whom contract is awarded must comply fully with requirements of G.S. Section 143-129, as amended including a bond in the full amount of the contract to secure the faithful performance of the contract and the payment of all services due for labor and materials. Bids may be held by the City for a period not to exceed thirty (30) calendar days from the date of the bid opening for the purpose of reviewing bids and investigating qualifications of Bidders. Once the winning bidder is established and accepted by the City, the City will notify the approved Contractor. The City will then begin the process of securing funds for the project. This is expected to take from 60 to 90 days before the NTP is released and work begins on the project. Bidders will ensure that employees and applicants for employment are not discriminated against because of their race, color, religion, sex, national origin, disability, or veteran's status. All bidders shall include in their bid package an affidavit that they and all sub-contractors have complied with E-Verify or are exempt from the requirement. Bidders must be properly licensed under North Carolina state law to perform the work. The City of Mount Holly reserves the right to reject any and all bids and to waive any informalities or technicalities as it may deem to be in its best interest.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents