Similar Projects
Renovation of Soccer Fields at Riverway Sports Park
Infrastructure
Design
$180,000 CJ est. value
Visalia, CA 93291

RFQ Contractor - Prequalification of Concrete - Peninsula Outpatient Center
Infrastructure, Renovation - 50,000 SF
Design
$250,000 CJ est. value
San Francisco, CA 94103

The Ranch House 6-Plex
Demolition, New Construction, Infrastructure - 3,793 SF
Bidding
$3,250,105 CJ est. value
Nevada City, CA 95959

Health, Dining and Housing Building Project
New Construction, Renovation, Infrastructure
Bidding
$165,000,000 CJ est. value
Arcata, CA 95521

Master As-Needed Agreement M14 Curb Ramp Construction
Term Contract
Sub-Bidding
$1,000,000 CJ est. value
San Francisco, CA 94103

2023-24 Annual Parks Concrete Rehabilitation Program
Infrastructure
Sub-Bidding
$250,000 CJ est. value
Santa Clarita, CA 91321

Joslyn Senior Center Renovation
Renovation, Infrastructure
Results
$1,033,800 CJ est. value
Redlands, CA 92373

Concrete Pad and Hydronic Tubing Replacement Services
Infrastructure
Results
$137,214 est. value
Truckee, CA 96161

Second Street Drainage and Parking Lot Improvements, Phase II
Infrastructure
Construction
$912,593 CJ est. value
Solvang, CA 93463

Tennis Court and Basketball Court Resurfacing and Windscreen Replacement
Infrastructure
Construction
$83,789 CJ est. value
Moorpark, CA 93021

Concrete Repairs and Maintenance
Term Contract
Design
Sanger, CA 93657

Beach Colony Pedestrian Improvements Project
Infrastructure
Bidding
$80,000 CJ est. value
Del Mar, CA 92014

Pacific Crest Gazebo Concrete and Pavilion Installation REBID
Infrastructure
Sub-Bidding
$100,000 CJ est. value
Santa Clarita, CA 91390

Place Minor Concrete, Replace Irrigation and Electrical Facilities
Alteration
Results
$5,400,000 est. value
CA

Relocatable Building at Redlands Unified School District Student Services Center
Renovation
Construction
$211,444 CJ est. value
Redlands, CA 92374

Last Updated 08/16/2023 12:55 PM
Project Title

Biosolids Digester Facilities - T-03.06: Structural Concrete Package 4 - B604, B605

Physical Address View project details and contacts
City, State (County) San Francisco, CA 94103   (San Francisco County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids
Project Status Construction Commenced, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

For Biosolids Digester Facilities - T-03.06: Structural Concrete Package 4 - B604, B605 The scope of work (SOW) for this package is to furnish and install Facility 604 and 605 structural concrete. This scope of work includes (but not limited to) all formwork, rebar and concrete placement, pre-cast concrete hatches, grouting, excavation and subgrade preparation, shoring, shoring wall demolition, dewatering, pile preparation, spoils handling, off-hauling hazardous soil materials, and hoisting. Applicants who pre-qualify as Bidders are hereby notified that work to be performed under this contract will be in full or in part financed by the Clean Water State Revolving Fund (SRF), administered by the United States Environmental Protection Agency (US EPA) and the State Water Resources Control Board (SWRCB), and the Water Infrastructure Finance and Innovation Act (WIFIA), also administered by the US EPA. Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are projectwide participation goals that the Contractor may seek to meet: 1. 5.6% MBE 2. 1.2% WBE The project wide requirement for Local Business Enterprise participation is 12% of the Contract Sum. The Local Hiring requirement for the Construction Phase of the Project is 30% laborers and 50% for apprentices for each trade. In accordance with California Labor Code Sections 1771.1 and 1725.5, no contract can be awarded to a Bidder without proof that the Bidder and all identified subcontractors are currently registered with the California Department of Industrial Relations. The BDFP Project team, in partnership with the City of San Francisco Contract Monitoring Division ("CMD"),Office of Economic and Workforce Development (OEWD), and the San Francisco Public Utilities Commission ("SFPUC") is committed to fostering strong, sustainable, and vibrant communities in the neighborhoods that we serve. The BDFP Project team is committed to providing certified Small & Micro Local Business Entities ("LBE") within Bayview Hunters Point ("Hyper-Local LBE") with meaningful opportunities to participate on the BDFP Project. In addition, we strongly encourage bidders to support the community by utilizing Hyper-Local LBEs and also hiring local residents of Bayview Hunters Point to fulfil the LBE participation and disadvantaged hiring goals. A list of Hyper-Local LBE firms is available electronically. Although a firm timeline for construction has not been determined, construction is not expected to commence prior to second quarter 2023.

Details

Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents