Similar Projects
ADA Compliance and Pedestrian Signal Upgrades
Infrastructure
Bidding

0.8 Miles of Asphalt Milling and Resurfacing on State Route 18F
Infrastructure
Bidding
Lewiston, NY

Asphalt Paving
Post-Bid

Asphalt Paving Services
Post-Bid
Lewiston, NY

Asphalt Concrete Milling and Resurfacing, Drainage Repairs and ADA Compliance on NY Route 265
Results
Less than $1,600,000 est. value
Niagara Falls, NY 14301

Highway Rehabilitation Project North Canal Road, CR 77 Old Niagara Road to the Erie Canal
Results
Lockport, NY 14094

Planing and Texturizing Existing Pavement
Results
Lockport, NY 14094

Paving and Stabilization Fabric
Results
Lockport, NY 14094

Walmore Road Rehabilitation Project - Niagara Falls Boulevard to Lockport Road
Results
Lockport, NY 14094

Highway Job Order Contract SFY 20/21, 21/22, 22/23, 23/24
Results
Less than $500,000 est. value

Stand by Project including Pavement, Guide Rail, Drainage, Etc. Work at Various Locations
Results
Less than $1,000,000 est. value

Pavement Maintenance/ Improvements: 2.7 Miles of Roadway
Results
Less than $2,400,000 est. value
North Tonawanda, Tonawanda, NY

Highway Rehabilitation, Mill and Fill
Results
Less than $6,900,000 est. value
Niagara Falls, NY

NFIA - Airside Pavement Maintenance 2021
Results
Less than $500,000 est. value
Niagara Falls, NY 14304

Paving and Engineering Stabilization Fabric
Results
Lockport, NY

Last Updated 05/27/2021 10:50 AM
Project Title

Rehabilitation of Buffalo Avenue, Rainbow Boulevard to 450 Feet West of 24th Street

Physical Address View project details and contacts
City, State (County) Niagara Falls, NY   (Niagara County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves pavement resurfacing with select areas of deeper pavement repairs, drainage improvements, new and replacement concrete sidewalks with ADA accessible ramps, areas of granite curb replacement, installation of new roadway signage and pavement markings. The approximate length of the project is 0.75 miles.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents