Similar Projects
Floating Kayak Launch System ADA Compliant
Infrastructure
Bidding
Milton, FL

Boathouse & Bulkhead Replacement
Alteration
Bidding
$1,000,000 to $5,000,000 est. value
FL

Perdido Key State Park - Building and Structure Repair
Renovation
Sub-Bidding
$840,000 est. value
Pensacola, FL 32507

Repairs to East Side of Pier Railing
Post-Bid
Deerfield Beach, FL 33441

Design-Build Floating Day Dock and Dinghy Dock
Post-Bid
Bradenton Beach, FL 34217

Rebuild UPH STA Ponce de Leon Inlet, New Smyrna Beach, FL
Results
$100,000 to $6,000,000 est. value
New Smyrna Beach, FL 32168

M&R Waterfront U.S. Coast Guard Station Sand Key, FL
Results
$1,000,000 to $5,000,000 est. value
Clearwater Beach, FL

The Wharf
New Construction - 11,982 SF
Construction
$965,056 est. value
Saint Augustine, FL 32084

Latitude Margaritaville Watersound Amenities, Phase 1 & 2
New Construction - 34,862 SF
Construction
$30,000,000 est. value
WaterSound, FL

Lake Washington Weir Wooden Boat Ramp and Pilings Removal and Miscellaneous Improvements
Infrastructure
Bidding
$40,000 est. value
Melbourne, FL 32934

Martin County Bs/Mpz Marker Construction Project
Post-Bid
Jensen Beach, Stuart, FL

NAVFAC Destroyer Slip South Quay Wall Restoration
Results
$10,000,000 to $25,000,000 est. value
Mayport, FL 32228

Bay Point Marina
New Construction, Infrastructure
Construction
$10,000,000 est. value
Panama City, FL

Reed Island Courtesy Docks
Infrastructure
Bidding
Jacksonville, FL

Depot Facility Bulkhead Repairs
Post-Bid
$1,000,000 to $2,000,000 est. value
Jacksonville, FL

Reported 04/23/2022 12:00 AM
Project Title

Anthony Park Dock Replacement

Physical Address View project details and contacts
City, State (County) Naples, FL 34102   (Collier County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value $30,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Dock Replacement (Converting existing pressure treated dock to IPE lumber) Scope of Work: 1. Remove All Decking, Stringers, 4x4 Posts And Attached Handrails. 2. Replace Decking With 1 x 6 Ipe Decking (Finished Size ¾’’x 5.5’’Or Larger) 3. Replace 4x4 Posts With Ipe Lumber. 4. Replace Handrails With Ipe. (See Picture For New Configuration) 5. Replace Retaining Wall With (2) 8 x 8 x 16’ Pressure Treated Marine Grade Lumber. Attach With #6 3/4’’ Epoxy Coated Rebar. (See Picture For Specs)

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents