Similar Projects
Music Conservatory Facilities Improvement and Upgrades
New Construction - 3,500 SF
Design
$1,000,000 est. value
White Plains, NY 10606

Elmira CSD 2021 EDA Pool Renovations & 2021 Capital Outlay
Renovation, Alteration
Bidding
Elmira, NY 14905

Capital Improvement Project - Phase 4
Renovation
Bidding
Corinth, NY

Maintenance and Installation General Construction Repairs and Carpentry Electrical Repair
Post-Bid
Blauvelt, NY 10913

Salamanca CSD 2019 Main Campus Alterations
Post-Bid
Less than $1,945,000 est. value
Salamanca, NY 14779

Sherburne-Earlville C.S.D Reconstruction at Sherburne - Earlville ES and MS Bus Maintenance Bus Storage
Results
Less than $4,400,000 est. value
Sherburne, NY

Fallsburg CSD - 2017 Capital Improvement Project - Phase 2A
Results
Fallsburg, NY

Mandela School Additions and Alterations
Construction
Mount Vernon, NY 10550

Port Chester Middle School Windows and Select Facade Replacement, Abatement, HV Upgrades, Bridge Renovations and Related Work
Construction
Port Chester, NY 10573

Time and Material for Horseheads CSD and Elmira CSD
Renovation
Bidding
Elmira, NY

Elmira Heights CSD 2019/20 Capital Outlay Project
Post-Bid
Elmira Heights, NY 14903

Tuckahoe Middle/High School Alterations and Turf Replacement
Renovation
Results
Less than $900,000 est. value
Eastchester, NY 10707

Additions, Renovations and Site Improvements at the Bronxville School
Renovation, Addition
Construction
Bronxville, NY 10708

Walton Central School District 2021 Capital Outlay Project
Bidding
$80,000 est. value
Watertown, NY

Network Infrastructure
Renovation, Addition
Post-Bid
Binghamton, NY 13901

Last Updated 06/03/2021 11:36 AM
Project Title

Salmon River Central School District Main Building Reconstruction Phase 4

Physical Address View project details and contacts
City, State (County) Fort Covington, NY   (Franklin County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced April 2021, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $17,560,444
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project includes Sitework, General, Plumbing, Mechanical and Electrical Construction Contracts for work associated with the Phase 4 Reconstruction at the Main Building for the Salmon River Central School District.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents