Similar Projects
Komarek School New Gymnasium Construction
New Construction
Conception
North Riverside, IL

Washington Elementary School Facility Expansion
Addition
Conception
Park Ridge, IL 60068

CPS Perkin Bass Elementary School MCR
Renovation
Bidding
$700,000 est. value
Chicago, IL 60621

Phase IV Group 2 STR
Post-Bid
Chicago, IL 60651

Kanoon 2021-29071-ROF / Polaris 2021-67081-ROF
Post-Bid
Less than $8,700,000 est. value
Chicago, IL 60623

2021 School Renovations and Additions
Renovation, Addition
Results
Mount Prospect, IL 60056

Roof Replacement Work 2021
Renovation
Results
Less than $400,000 est. value
Chicago, IL 60638

Arie Crown Hebrew Day School
Renovation, Addition - 165,000 SF
Construction
$20,000,000 est. value
Skokie, IL 60076

Worth Elementary
Renovation, Addition
Construction
Worth, IL 60482

Mckenzie Elementary School and Romona Elementary School
Renovation, Addition
Post-Bid
Wilmette, IL

NCP Hibbard Elementary School
Results
Chicago, IL 60625

ROF Dett ES & Ericson ES
Post-Bid
$8,000,000 est. value
Chicago, IL 60612

MEP Disney Magnet School
Renovation
Results
$10,000,000 est. value
Chicago, IL 60613

Hibbard Elementary School Pool
Renovation
Post-Bid
Chicago, IL 60625

2021-25681-SIT Volta ES
Renovation
Results
Chicago, IL 60625

Reported 06/10/2022 12:00 AM
Project Title

D107 Pleasantdale Elementary School Classroom Renovation

Physical Address View project details and contacts
City, State (County) Willow Springs, IL 60480   (Cook County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A. The Project consists of the following general activities as described in the Construction Documents and Project Manual for Pleasantdale ES Classroom Renovation, located in La Grange, Illinois for Pleasantdale District 107. B. The work of the Project shall include all labor, material, and equipment to provide complete installation of all work including all code required devices and functions that may not specifically be indicated in this Project Manual. 1. The work includes (not to be taken as a complete description or extent of the work) as follows: a. selective demolition of walls b. selective demolition and replacement of existing suspended acoustical ceiling system and lighting; reinstallation of electrical devices and HVAC grilles and equipment to remain c. new fixtures and electrical work d. new finishes and patching of walls, floors and ceilings e. relocation and reinstallation of existing casework

Details

Elementary School, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents