Similar Projects
Chase Tank - City of Corona
Infrastructure
Conception
$6,000,000 CJ est. value
Corona, CA 92879

Main Library Remodel - 16-08 - City of Palm Springs
Demolition, Build-out, Infrastructure
Conception
$9,738,000 CJ est. value
Palm Springs, CA 92262

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Dave's Hot Chicken / Cathedral City
Demolition, New Construction, Infrastructure - 2,675 SF
Design
$800,000 CJ est. value
Cathedral City, CA 92234

Washington Street at Avenue 50 and Calle Tampico Sidewalk and Ada Improvements
Infrastructure
Bidding
$120,000 CJ est. value
La Quinta, CA 92253

Washington Street at Avenue 50 and Calle Tampico Sidewalk and Ada Improvements
Infrastructure
Bidding
$120,000 CJ est. value
La Quinta, CA 92253

Riverside Facility Asphalt Overlay Project
Infrastructure
Post-Bid
Riverside, CA 59968

Pavement Striping, Markings and Markers
Infrastructure
Post-Bid
Cathedral City, CA 92234

2021 Citywide Slurry Seal Project
Infrastructure
Results
$3,200,000 est. value
Murrieta, CA 92562

52nd Avenue Resurfacing Monroe Street to Van Buren Street Project No. D0-0065 and Calhoun Street Reconstruction 54th Avenue to 0.12 Miles North of 52nd Avenue Project No. C9-0012
Infrastructure
Results
$1,390,000 to $1,620,000 est. value
Riverside, CA 92519

Hillcrest HS Portables
New Construction, Infrastructure
Construction
$587,000 CJ est. value
Riverside, CA 92503

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

Amanda Ave and Winchester Road Mixed-Use
New Construction, Infrastructure - 7,550 SF
Pending Verification
$3,300,000 CJ est. value
Riverside, CA 92522

BNSF Quiet Zone - Mission Inn Avenue, 3rd Street, and Spruce Street - 8610 - City of Riverside
Infrastructure
Conception
$3,200,000 CJ est. value
Riverside, CA 92501

Virada - Future Phases
New Construction, Infrastructure
Design
$326,000,000 CJ est. value
Indio, CA 92201

Last Updated 10/17/2022 10:09 AM
Project Title

Rdwy Exc, Str Exc, Class 2 Ab, Partially Grouted RSP, Chain Link Fence

Physical Address View project details and contacts
City, State (County) Riverside, CA 92506   (Riverside County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $6,543,402 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Rdwy Exc, Str Exc, Class 2 Ab, Partially Grouted RSP, Chain Link Fence 08-riv-10-r92.9/r101.1 Project ID 0816000177 Federal-Aid Project ACIM-010-4(066)E In Riverside County at Various Locations From Krume Ditch to Wide Ditch The Contractor Must Have Either a Class a License or the Following Class C License Which Constitutes a Majority of the Work: C-12. 550 Working Days Submit your bid with bidder's security equal to at least 10 percent of the bid. CADOT - Install Soldier Piles, Place Concrete, and Install Electrical Systems

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents