Similar Projects
Dillon Lake State Park Wastewater Improvements
Renovation
Conception
Nashport, OH 43830

Little Miami Wastewater Treatment Plant Solids Disposal with Odor Control
New Construction
Bidding
$145,000,000 est. value
Cincinnati, OH

Eastern Regional Belt Filter Press Replacement
New Construction
Bidding
$4,200,000 est. value
Dayton, OH 45432

Activated Sludge and Aerobic Digestion Process Equipment Procurement
Post-Bid
Piketon, OH

Wastewater Transmission System Upgrades
Post-Bid
$635,934 est. value
OH

JPWWTP Digester Improvements 650240-100000
Results
Less than $28,314,469 est. value
Columbus, OH

Wastewater Treatment Plant Final Build-Out Phase Utilizing the Construction Manager at Risk (CMAR)
Results
Less than $4,500,000 est. value
Delphos, OH 45833

WWTP Sludge Digestion and Handling Improvements
Renovation
Construction
$9,000,000 est. value
Aurora, OH 44202

Refractory Inspection and Repair Services
Term Contract
Bidding
$178,000 est. value
Cleveland, OH 44125

Portable Gas Meter Replacement and Implementation Project
Post-Bid
Cleveland, OH

Wastewater Treatment Plant Improvements
Results
Less than $6,340,462 est. value
West Salem, OH 44287

Part A - Newtonsville Area Wastewater Treatment Plant
Renovation
Bidding
$4,240,000 est. value
OH

Progressive Design Build - New Wastewater Treatment Plant
New Construction
Post-Bid
Less than $29,000,000 est. value
Wilmington, OH 45177

WWTP Improvements Phase 1
Results
Less than $1,400,000 est. value
Perrysville, OH 44864

Part B - Newtonsville Collection System Assessment
Renovation
Bidding
$7,500,000 est. value
OH

Last Updated 12/06/2021 09:47 AM
Project Title

Ridgeland Sewage Treatment Plant Replacement

Physical Address View project details and contacts
City, State (County) Steubenville, OH   (Jefferson County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,485,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new precast concrete aeration treatment plant with a 20,000 GPD capacity.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents