Reported 03/22/2022 12:00 AM
Project Title

First Avenue Roadway and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Indian Trail, NC 28079   (Union County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of regrading and restabilizing existing roadway drainage ditches on First Avenue in Indian Trail. It also consists of replacing existing residential driveway pipes with new culverts/pipes on certain properties in the neighborhood. Also include is replacement of existing water main on one side of the street and full depth reclamation of the roadway.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents