Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Pavement Resurfacing
Post-Bid
Burr Ridge, IL

Repair Roads and Concrete
Post-Bid
$500,000 est. value
Glen Ellyn, IL

Addison Campus Parking Lot Improvements
Results
Addison, IL 60101

The Improvement Consists of Cleaning (Daytime Sweeping) Various Expressways Throughout District One in Various Counties
Results

Earthwork
Post-Bid
Glendale Heights, IL 60139

2021 MFT Street Maintenance Program
Results
Hinsdale, IL

Fire Hydrant Maintenance and Flow Testing
Post-Bid
Downers Grove, IL

Sidewalk
New Construction
Results
Less than $261,687 est. value
IL

2021 Crack Sealing Bituminous Pavement
Post-Bid
Bloomingdale, IL

RR-20-4544 - M-8 Maintenance Facility Westbound Access Road
Renovation
Results
Oak Brook, IL 60521

Pavement Resurfacing
Post-Bid
Naperville, IL

2021 Street and Pavement Patching Programs
Results
Roselle, IL

2021 Thermoplastic Lane Marking Material & Labor
Term Contract
Post-Bid

Last Updated 08/15/2022 04:01 PM
Project Title

Roger's Farm Subdivision Resurfacing (Various Streets)

Physical Address View project details and contacts
City, State (County) Willowbrook, IL 60527   (DuPage County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $509,686 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 15, 2022, the project has been awarded to M and J Asphalt Paving for $509,686.15. HMA surface removal; curb and gutter spot repairs; PC concrete, brick and HMA driveway spot repairs; PC concrete sidewalk spot repairs; HMA level binder and surface course installation; drainage structure adjustments; and topsoil, seed or sod parkway restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Drainage Structures.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents