Similar Projects
2022 Curb and Sidewalk Repairs
Infrastructure
Design
$180,000 CJ est. value
Somerset, WI 54025

2022 Curb and Sidewalk Repairs
Infrastructure
Design
$180,000 CJ est. value
Somerset, WI 54025

St. Croix County -2023 Government Center Phase 2 Improvements - Bid Package 4
Demolition, Renovation, Infrastructure
Bidding
$46,000,000 CJ est. value
Hudson, WI 54016

St Croix County Government Center - Phase 2 -Bid Category 6
Demolition, Renovation, Infrastructure
Bidding
$46,000,000 CJ est. value
Hudson, WI 54016

Storm Damage Repair
Infrastructure
Post-Bid
Hudson, WI

Various Construction Season Materials/Services
Infrastructure
Post-Bid
Baldwin, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Street Maintenance
Alteration
Results
$326,910 est. value
Hudson, WI

Bouchea Apartments
New Construction, Infrastructure - 23,757 SF
Construction
$25,000,000 CJ est. value
Hudson, WI 54016

Bouchea Apartments
New Construction, Infrastructure - 23,757 SF
Construction
$25,000,000 CJ est. value
Hudson, WI 54016

Hudson Medical Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$50,000,000 CJ est. value
Hudson, WI 54016

Hudson Medical Center
New Construction, Infrastructure - 160,000 SF
Pending Verification
$50,000,000 CJ est. value
Hudson, WI 54016

St. Croix Meadows Redevelopment
New Construction, Infrastructure - 555,000 SF
Design
$195,000,000 CJ est. value
Hudson, WI 54016

2022 Road Maintenance
Infrastructure
Post-Bid
Boardman, WI 54016

Baldwin - Menomonie, Wilson Creek Bridge, B-17-0206
Infrastructure
Results
Baldwin, Menomonie, WI

Last Updated 03/09/2023 03:13 PM
Project Title

2023 Road Improvements

Physical Address View project details and contacts
City, State (County) Roberts, WI 54023   (Saint Croix County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Major Quantities on the Project Include: 1 LS Maintenance of Traffic 276 LF Bio Logs 14,015 SY Pulverizing Asphaltic Pavement 13 Each Exploratory Excavation 662 CY Subgrade Excavation 694 SY Geotextile Fabric 530 CY Granular Borrow (CV) 265 Ton Breaker Run 50 CY Ditch Cleaning 3 Each Culvert Cleaning 204 LF Remove and Replace Culvert Pipe 12 147 Each CY Apron Endwalls Aggregate Base Placed, Salvaged Bit 278 Ton Base Aggregate Dense, 1-1/4 inch 738 Ton Base Aggregate Dense, 3/4 inch 2,788 Ton Asphaltic Pavement 189 CY Topsoil Borrow 1,700 SY Turf Establishment 1,133 SY Erosion Mat Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bidders Proof of Responsibility must be submitted to SEH in accordance with the Instructions to Bidders. Contractors on the Project shall be required to comply with the minimum wages in effect for the State of Wisconsin. The Town of Kinnickinnic reserves the right to reject any and all bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Town.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents