Similar Projects
Highland Avenue Apartment Complex
New Construction - 23,660 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Pittsburgh, PA 15206

Suburban Avenue Multi Unit Residential
Renovation - 6,820 SF
Conception
Pittsburgh, PA 15216

Esplanade - Master Plan
New Construction - 1,220,000 SF
Design
$600,000,000 est. value
Pittsburgh, PA 15233

One Smithfield
Renovation - 132,000 SF
Design
$5,000,000 est. value
Pittsburgh, PA 15222

Former Post-Gazette Building
Renovation - 250,000 SF
Post-Bid
Pittsburgh, PA 15222

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Construct Classroom at Main Station Farm
New Construction, Infrastructure - 6,000 SF
Results
$4,905,999 CJ est. value
Reno, NV 89502

Structure Demolition
Demolition, Infrastructure
Results
$25,000 est. value
Pittsburgh, PA 15235

East Street Mixed Use
Renovation - 5,574 SF
Construction
$300,000 est. value
Pittsburgh, PA 15212

Smith & Fifth
Renovation - 286,000 SF
Construction
$13,421,302 est. value
Pittsburgh, PA 15222

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

Oakland Crossings - Halket Street
New Construction
Conception
Pittsburgh, PA 15213

Shady Hill Center
New Construction - 445,200 SF
Design
$10,000,000 CJ est. value
Pittsburgh, PA 15206

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Swissvale, PA 15218

Last Updated 04/24/2023 02:43 PM
Project Title

Northwood Commons

Physical Address View project details and contacts
City, State (County) Penn Hills, PA 15147   (Allegheny County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $15,088,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of affordable apartments. As of April 20, 2023, the project has received approvals for tax credit financing from the State of Pennsylvania. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin by fourth quarter 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents