Similar Projects
Nelson Worldwide Mixed Use
New Construction
Conception
Suwanee, GA 30024

Pettit Farm PUD
New Construction
Conception
Cartersville, GA

White Street Commons
New Construction
Design
Atlanta, GA 30310

Creekside Whitehead
New Construction
Design
Sugar Hill, GA 30518

Contractors - Residential Construction Services for 31520 Hurricane Irma Homeowner Rehabilitation and Reconstruction Program (HRRP)
New Construction
Bidding
Brunswick, GA

SR 16 at SR 54 Water Main Relocation
Infrastructure
Bidding
$310,000 est. value
Newnan, GA 30264

Conyers Street Gym Development
New Construction
Post-Bid
Covington, GA 30014

Purchase of Water Meters on an Annual Contract
Post-Bid
Lawrenceville, GA

South Annexation - GEFA Phase III Infrastructure
Results
Richmond Hill, GA 31324

Dunbar Road Water Main Extension
Results
Warner Robins, GA 31095

Clark Lake Village
New Construction
Construction
Grayson, GA 30017

New Hope Reserve
New Construction - 50,400 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Dacula, GA

Hamilton Mill Road Sub-division
New Construction
Pending Verification
Buford, GA 30519

Grayson New Hope Road @ Round Road
New Construction - 318,600 SF
Pending Verification
$10,000,000 CJ est. value
Grayson, GA 30017

Watson Farms
New Construction
Conception
Loganville, GA 30052

Last Updated 07/06/2022 11:40 PM
Project Title

Lake Kedron Intake House Repairs

Physical Address View project details and contacts
City, State (County) Peachtree City, GA 30269   (Fayette County)
Category(s) Residential, Sewer and Water
Sub-Category(s) Single-Family Homes, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Equipment demolition/clean up 1) Remove damaged valve shaft (for 10-inch BFV) and pipe supports. 2) Removal of loose material from bottom of the riser structure. 3) Demolition of existing water level/valve panel (Turbotrol panel) and associated fixtures/conduits. Repairs 1) Construct new valve shaft and replacement pipe supports (stainless steel). 2) Repair valve shaft operator stand concrete base. 3) Ensure operation of existing BFV and gate valve. 4) Replace existing defunct AUMA Actuator with AUMA quarter-turn electric actuator (SQ.R10.2/AC01.2) with hand wheel operator or equal. 5) Connect power (existing power junction box) and control wiring (existing SCADA panel) to new actuator. 6) Replace 10" gate valve operator wheel. 7) Repair and/or replace riser access ladder (aluminum). 8) Installation of switch operated 200-watt LED marine flood light in riser. Building Work 1) Installation of varmint control for intake building - hardware cloth and/or flashing and/or soffit. 2) Installation of roof ridge vent. 3) Installation of metal exterior siding and flashing (beige). 4) Paint access door (clean, prime, paint with beige exterior acrylic latex). 5) Paint Interior walls (clean, prime, paint with white exterior acrylic latex). 6) Paint existing interior railing (clean and paint with direct to metal DTM acrylic paint).

Details

Single-Family Homes, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents