Similar Projects
Asbestos Floor Tile and Mastic Abatement in Room 208-Pre-qualified Various Trades- Environmental
Alteration
Bidding
$40,000 est. value
Chicago, IL 60608

2021 Flooring Replacement
Post-Bid
Park Ridge, IL 60068

2021 Flooring Renovations
Post-Bid
Matteson, IL 60443

CPS Otis ES Hallway Tile Replacement
Term Contract
Results
Chicago, IL 60642

Des Plaines Boardroom Expansion/Renovation Athletic/Theater Wing Flooring Replacement
Term Contract
Results
Arlington Heights, IL

ACM Removal
Post-Bid
Palos Hills, IL 60465

N072--Removal and Replacement of Existing Flooring
Term Contract
Results
Chicago, IL 60612

Administration Building Flooring
Post-Bid
Riverside, IL

Hay ES Gym Floor
Alteration
Results
Chicago, IL 60651

Corridor Floor Polishing
Post-Bid
Cicero, IL

Cather ES Asbestos Abatement and Flooring Replacement
Alteration
Results
Chicago, IL

Morton College Corridor Floor Polishing
Renovation
Post-Bid
Cicero, IL 60804

Gym Floor and Bleacher Replacement
Renovation, Alteration
Results
Streamwood, IL 60107

Fire Station 55 Carpet Replacement
Post-Bid
Schaumburg, IL 60193

Construction Services for carpet, floor, wood concrete and sub-floor
Alteration
Results
Chicago, IL 60661

Last Updated 07/18/2022 11:07 PM
Project Title

Bogan High School Floor Tile Installation

Physical Address View project details and contacts
City, State (County) Chicago, IL 60652   (Cook County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $40,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide all labor and materials to complete floor tile (VCT) installation, including all necessary underlayment, base, and thresholds (Floor/tile will be abated/removed down to concrete substrate by CPS environmental contractors). All work and materials are to adhere to CPS Specifications: o SECTION 09 65 00 RESILIENT FLOORING o SECTION 06 10 00 ROUGH CARPENTRY Vendor will be responsible for coordinating installation with the abatement team and the school engineer. All included rooms will have floor/tile abated/removed by environmental contractor down to concrete substrate. Floor and tile (VCT) will need to be built back up from that condition. CPS specifications are included for reference. Walkthrough is mandatory and bidders are responsible for verifying areas of four rooms: - Room 222 - 30FT X 24FT - Room 224 - 30FT X 24FT - Room 226 - 30FT X 24FT - Room 229 - 30FT X 24FT

Details

Division 09 - Finishes, Tiling, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents