Similar Projects
IH 43 North South Freeway, Highland Road - STH 60
New Construction, Infrastructure
Bidding
WI

Durand - Mondovi, Holmes Creek Bridge, B-06-0387
New Construction, Infrastructure
Bidding
WI

CTH M Bridge P-3-43
Post-Bid
$300,000 est. value
WI

Spring Creek Bridge
New Construction, Infrastructure
Post-Bid
WI 54949

C20-03 Broad Street Bridge Deck Repair
Results
Beloit, WI 53511

Snowmobile Bridge Replacement Mount Vernon Creek - Dane 9 Bridge
Results
New Glarus, WI 53574

The Couture Apartments
New Construction
Construction
Milwaukee, WI 53202

Neillsville - Thorp, Giles Creek, B-10-0040
New Construction, Infrastructure
Bidding
WI

2021 Colley Road and Stateline Road Bridge Deck Sealing
New Construction, Infrastructure
Post-Bid
Beloit, WI 53511

890th Street - Cth S, Popple Creek Bridge
Results
WI

Winona - Galesville, Beaver Creek Bridge, B-61-0048
New Construction, Infrastructure
Bidding
Trempealeau, WI

Rowan Creek Snowmobile Bridge Replacement
Post-Bid
WI

Town of Ithaca, Mcavoy Hill Road, Little Willow Creek Bridge
Results
WI

T. Arcadia, Pyka Road, North Creek Bridge, B-61-0242
New Construction, Infrastructure
Bidding
WI

Snowmobile Bridge Replacement Spring Valley Creek - Dane 15 Bridge
New Construction, Infrastructure
Post-Bid
New Glarus, WI 53574

Last Updated 11/02/2021 04:22 PM
Project Title

Chippewa County Boyd Cut Across Snowmobile Bridge

Physical Address View project details and contacts
City, State (County) WI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Design, professional engineering, reconstruction and installation of a snowmobile trail bridge, including appropriate pilings and a 25,000 lb weight limit. The bridge will be owned by Chippewa County and installed across an unnamed Creek on private land in the Northeast ¼ of the Northwest ¼ of Section 27, T22N R6W, Town of Goetz, Chippewa County

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents