Similar Projects
Electrical, Framing, Mechanical, Flooring,Plumbing, Drywall
Alteration
Design
San Francisco, CA 94128

City of Folsom Greenback Sewer and Lift Station Improvements Project
Renovation, Infrastructure
Bidding
$2,249,000 CJ est. value
Folsom, CA 95630

Marina Middle School Courtyard Restoration
Infrastructure
Bidding
$758,000 CJ est. value
San Francisco, CA 94123

Butterfly Valves for Ramona Pipeline Valve Replacement
Infrastructure
Sub-Bidding
$1,500,000 CJ est. value
San Diego, CA 92101

Storm Channel Cleaning Services
Term Contract
Sub-Bidding
$40,000 CJ est. value
Oxnard, CA 93030

Non-Personal Services for Water Heater and Plumbing Repairs at NOAA NMFS Santa Cruz Laboratory
Term Contract
Post-Bid
Santa Cruz, CA

On-Call Plumbing Services
Alteration
Post-Bid

Plumbing Contractor
Term Contract
Results
Concord, CA

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Phase 1A Water CIP
Infrastructure
Construction
$1,313,318 CJ est. value
Stockton, CA 95202

Well No. 15 Test Hole
Infrastructure
Bidding
$398,050 CJ est. value
Chowchilla, CA 93610

Plumbing Services
Term Contract
Sub-Bidding
$200,000 CJ est. value
San Jose, CA 95113

Architectural Engineering And Related Professional Technical Support Services
Term Contract
Post-Bid
CA

Orchard Dale Elementary School Modernization Project- Plumbing
Alteration
Results
Whittier, CA 90603

Folsom Area Stormwater Improvements - Soma and Mission Districts Sewer Replacement
Infrastructure
Bidding
$8,200,000 CJ est. value
San Francisco, CA 94103

Last Updated 02/27/2023 12:31 AM
Project Title

Braemar Lift Station Rehabilitation Project

Physical Address View project details and contacts
City, State (County) Santa Barbara, CA 93109   (Santa Barbara County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Results, Construction start expected April 2023 , Request For Proposals
Bids Due View project details and contacts
Estimated Value $6,479,626 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Liquidated Damages $1,140 per day The estimated construction cost is $5,100,000 Location and Description. The Project is located at 404 Alan Road, Santa Barbara, California and is described as follows Question Deadline 01/23/2023 at 3:00 PM PT Online Q&A Yes Questions may be directed to: Barbara August, SWRCB Barbara.August@waterboards.ca.gov Phone: (916) 341-6952 Fax: (916) 327-7469 The Work involves rehabilitation of the Braemar Lift Station. It consists of replacement of existing pumps, valves, and piping, replacement of existing ventilation fans and ducting in the dry well, replacement of valve vaults, installation of new variable frequency drives, construction dry flood proofing measures, and replacement of existing motor control center and control system. The Project site is located at the Braemar Lift Station situated on the corner of Cliff Drive and Alan Drive, Santa Barbara, California. The Project is intended to replace aging equipment, and address long standing issues with odor control and operational and maintenance challenges. The limits of work are restricted to north of the existing sidewalk, south of the dry well and electrical room, and directly east of the existing station. The limits of works are restricted to developed, disturbed, and ornamental areas measuring roughly 640 square feet within the limits of the existing Braemar Lift Station. Construction is scheduled to begin August 2022 and complete October 2023. The work generally includes replacement of the existing pumps and motors with new units including Variable Frequency Drives (VFD). Other work items include the ventilation system, wet well, motor control center, supervisory control and data acquisition system, the removal of two site walls and exterior piping, replacing pumping and electrical systems, rehabilitation of the wet-well interior, and replacement of outiet piping and valves adjacent to the building. There will be demolition of the existing ornamental planter area to provide for relocation of the emergency pump bypass connections, including construction of a new catch basin and drain piping, which is proposed to be graded and revegetated after construction. Revegetation will follow the policies designated in the City of Santa Barbara's Coastal Land Use Program / Coastal Land Use Plan (2019), including Policy 4-1.19 (Plantings within ESHA Buffer) and Policy 4.1-36 (Bird Breeding and Nesting). PROJECT NO. 48367, BID NO. 5439 The City anticipates work to begin on or about March, 2023. The construction completion is 670 calendar days.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents