Similar Projects
Seabrook Volunteer Fire Department Floor Resurfacing
Post-Bid
Seabrook, TX 77586

Floor Coverings-VCT and Related Supplies
Term Contract
Post-Bid
Pasadena, TX

Flooring Replacement and Millwork for Nursing Unit 5F/G at Ben Taub Hospital
Results
Houston, TX 77030

Flooring Replacement and Millwork for Nursing Units 3F and 6E at Ben Taub Hospital
Results
Houston, TX 77030

Carpet and Resilient Flooring
Term Contract
Post-Bid
Houston, TX

Floor Preparation, Coating and Anti-Slip Additive for PHA MEB
Results
Less than $9,988 est. value
Houston, TX 77020

J--Service Contract for Carpet Removal and New Flooring Installation
Post-Bid
Houston, TX 77030

Flooring Replacement in the Connector Area Between Ben Taub Hospital and Towers
Results
Houston, TX 77030

Flooring Removal and Installation
Post-Bid
Abilene, Amarillo, Atlanta, Austin, Beaumont, Brownwood, Bryan, Childress, Corpus Christi, Dallas, El Paso, Fort Worth, Houston, Laredo, Lubbock, Lufkin, Odessa, Paris, Pharr, San Angelo, San Antonio, Tyler, Waco, Yoakum, TX 79601

Remove Carpet and Install VCT Flooring at Fire Station 65
Post-Bid
Houston, TX 77251

Carpet Tile and Cove Base
Post-Bid
Houston, TX 77251

JCP Portrait Studio Carpet Refresh Texas
Post-Bid
Arlington, Houston, Katy, Rosenberg, TX 77001

Informal - Waterhog Floor Mats BCT Lobby Areas
Post-Bid
Houston, TX 77029

Flooring and Outdoor Surface Solutions
Post-Bid
Houston, TX 77092

Replace Ezekiel Cullen, Building 516, Ground Floor Flooring
Post-Bid
Houston, TX 77004

Reported 07/02/2019 12:00 AM
Project Title

J--Service Contract for Carpet Removal and New Flooring Installation

Physical Address View project details and contacts
City, State (County) Houston, TX 77030   (Harris County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description The Contractor shall provide all the necessary labor, supervision, equipment, tools and flooring materials to remove the existing carpet and install new flooring materials within 90 days after award of contract.
Details
Division 09 - Finishes, Flooring.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents