Similar Projects
Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

Blackburn Street Multi-Residential Renovation
Addition, Demolition, Infrastructure
Design
$600,000 CJ est. value
Gurnee, IL 60031

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Blumberg Park
Renovation
Post-Bid
Less than $2,000,000 est. value
Deerfield, IL 60015

2021 Water Distribution Pressure Sensors
Post-Bid
Lake Forest, IL 60045

Sealcoating and Striping at Various Locations
Results
Lake Zurich, IL

2021 Road Program
Results
Lake Zurich, IL

Midwest Industrial - Village of Libertyville
Addition, Build-Out - 480,580 SF
Pending Verification
Libertyville, IL 60048

Forest Cove Sanitary Lift Station Replacement
Post-Bid
Waukegan, IL

Asphalt Pavement and Concrete Sidewalk Repairs
Results
Libertyville, IL 60048

Rollins Road Water Main Improvements
Post-Bid
$168,300 est. value
Waukegan, IL

Waveland Avenue Water Main and Storm Sewer Improvements
Results
$400,000 est. value
Gurnee, IL

2021 Road Repairs
Term Contract
Post-Bid
Antioch, IL

2021 Behm Park Improvements
Renovation
Results
Mundelein, IL 60060

Last Updated 12/01/2022 01:39 PM
Project Title

Edina Park Bike Trail

Physical Address View project details and contacts
City, State (County) Zion, IL 60099   (Lake County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Park/Playground, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $497,872 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

**As of November 30, 2022, this project has not yet been awarded. A timeline for award has not yet been established.** The Zion Park District does hereby invite sealed bids for Edina Park Bike Trail Work will include earthwork operations, temporary fencing and erosion control, asphalt patching, concrete curbs and paving, crushed stone paving, site furnishings, turf grass seeding, and drainage improvements. All bidders will be required to submit Bid Security in the form of a Bid Bond, Certified Check, Cashier's Check in the amount of 10% of the Base Bid, payable to the Zion Park District. No proposals or bids will be considered unless accompanied by such bond or check. The successful bidder, as determined by the Zion Park District, shall be required to pay, and to agree to pay no less than the Prevailing Rate of Wages for the locality of the Zion Park District, to each laborer worker, or mechanic needed or used to complete the work as detailed in the contract to be let. The Zion Park District reserves the right to reject any and all proposals, parts of any and all proposals, or waive technical errors or omissions in submitted proposals. The Zion Park District will award the contract to the lowest most responsible and responsive Bidder, as determined by the Zion Park District. In considering the Bidder's responsibility, the Zion Park District may evaluate, among other factors, the ability of the Bidder to provide experienced labor sufficient in numbers to timely and properly complete the services, the financial capability of the Bidder, and the performance of the Bidder on other projects. No submitted bid may be withdrawn until a period of sixty (60) days after the bid opening date, without written consent of the Zion Park District. The Zion Park District encourages minority business firms to submit bids on this project and the successful contract bidder to utilize minority businesses as sub-contractors for supplies, equipment, services, and construction. Questions should be directed to Lacey Lawrence, Hitchcock Design Group at llawrence@hitchcockdesigngroup.com, or 630.961.1787.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents