Project Title | O`Shaughnessy Hydro Turbine Facility Improvements |
Physical Address | View project details and contacts |
City, State (County) | Columbus, OH 43215 (Franklin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacing unit components that have exceeded their design life and are beyond repair (such as the output shafts for both units and the Unit 1 oil head) or where it is economically and strategically advantageous for the long-term reliability of the units (such as the lubrication and governor hydraulic power units (HPUs) for both Units 1 and 2); Repairing and reusing existing unit components that are in good condition (such as the turbine embedded parts, generators, exciters and bearings); Replacing mechanical balance of plant systems (including piping, instrumentation, and devices); Installing new plant and unit controls with state-of-the-art equipment; Replacing damaged switchgear cables and switchgear equipment that has reached the end of its service life; and Inspecting and refurbishing or replacing tailrace stop logs, including removing rock debris in tailrace water passage. The rehabilitation of the hydroelectric facility and its components are to be returned to a fully working generation plant. |
||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |